Test your basic knowledge |
Comptia Project + Project Management
Start Test
Study First
Subjects
:
certifications
,
comptia-project-+
,
it-skills
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. A quantitative assessment of the likely amount or outcome. usually applied to project costs - resources - effort and durations.
specification limits
three point estimate (Technique)
estimate (Output/Input)
project
2. Type of procurement document whereby the buyer requests a potential seller to provide various pieces of information related to a product or service or seller capability
request for information (RFI)
rolling wave planning (Technique)
historical information
objective
3. Management methodology for integrating scope - schedule and resources and for objectively measuring project performance and progress. performance is measured by determining the budgeted cost of work performed (earned value) and comparing it to the ac
project
Gantt chart (Tool)
earned value management (EV
resource breakdown structure
4. Multiple attributes associated with each schedule activity that can be included within the activity list. activity attributes include activity codes - predecessor activities - successor activities - logical relationships - leads and lags - resource r
activity attributes (Output/Input)
manage project team (Process)
procurement documents (Output/Input)
project management
5. Partially complete document in a predefined format that provides a defined structure for collecting - organizing and presenting information and data
resource histogram
change control board (CCB)
template
monitor and control risks (Process)
6. Those processes performed to complete the work defined in the project management plan to satisfy project objectives
executing processes (Process Group)
application area
estimate (Output/Input)
performance reports (Output/Input)
7. Change to project scope. almost always requires an adjustment to the project cost or schedule
responsibility assignment matrix (RAM) (Tool)
calendar unit
scope change
objective
8. The earliest point in time on which the uncompleted portions of a schedule activity can start - based on the schedule network logic - the data date and any schedule constraints.
assumptions analysis (Technique)
early start date (ES)
risk
bottom-up estimating (Technique)
9. Document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organization resources to the project activities
project charter (Output/Input)
program evaluation and review technique (PERT)
project cost management (Knowledge Area)
claim
10. Technique that computes or iterates the project cost or project schedule many times using input values selected at random from probability distributions of possible costs or durations - to calculate a distribution of total project costs or completion
Monte Carlo analysis
inspection (Technique)
forward pass
project management body of knowledge
11. A request - demand or assertion of rights by a seller against a buyer or vice versa for consideration - compensation - or payment under the terms of a legally binding contract (such as for a disputed change)
closing processes (Process Group)
claim
estimate to complete (ETC)(Output/Input)
variance analysis (Technique)
12. A technique that explores the accuracy of assumptions and identifies risks to the project from inaccuracy - inconsistency - or incompleteness of assumptions
risk tolerance
assumptions analysis (Technique)
invitation for bid (IFB)
application area
13. Group of persons with a shared objective who fulfill their roles with little or no time spent meeting fact to face.
buffer
request for information (RFI)
virtual team
project communications management (Knowledge Area)
14. Members of the project team who are directly involved in project management activities
time scaled schedule network diagram (Tool)
enterprise environmental factors (Input/Output)
to complete performance index (TCPI)
project management team
15. Something tangible used in performing an activity to produce a product or result
reserve analysis (Technique)
project schedule network diagram (Output/Input)
milestone
tool
16. Smaller portion of the overall project created when a project is subdivided by their logical relationship
approved change request (Output/Input)
subproject
collect requirements (Process)
closing processes (Process Group)
17. Output from performing project management processes and activities. results include outcomes and documents.
result
monitor and control project work (Process)
subproject
path divergence
18. Communicating and working with stakeholders to meet their needs and address issues as they occur
closing processes (Process Group)
program management
requirements traceability matrix
manage stakeholder expectations (Process)
19. Graphic display of cumulative costs - labor - hours - percentage of work or other quantities - plotted against time. used to depict planned value - earned value and active costs.
s-curve
project phase
Gantt chart (Tool)
early finish date (EF)
20. Schedule network diagramming technique in which schedule activities are represented by boxes or nodes. schedule activities are graphically linked by one or more logical relationships to show the sequence in which the activities are performed
reserve analysis (Technique)
late start date (LS)
sequence activities (Process)
precedence diagramming method (PDM) (Technique)
21. Float (total float - free float)
historical information
responsibility assignment matrix (RAM) (Tool)
slack
project management process group
22. Modification of a logical relationship that directs a delay in the successor activity. activity with a 10 day lag - cannot start until 10 days after an activity is finished
lag (Technique)
brainstorming (Technique)
projectized organization
path convergence
23. Schematic display of the logical relationships among the project schedule activities. drawn from left to right.
successor activity
project schedule network diagram (Output/Input)
output (Process)
failure mode and effect analysis (FMEA) (Technique)
24. Type of procurement document used to request price quotations from prospective sellers of common or standard products or services
technique
develop project charter (Process)
request for quotation (RFQ)
produce scope
25. Narrative description of products - services or results
human resource plan
project scope management (Knowledge Area)
monitor and controlling processes (Process Group)
statement of work (SOW)
26. Document that describes how procurement processes from developing procurement documentation through contract closure will be managed
hammock activity
parametric estimating (Technique)
technique
procurement management plan (Output/Input)
27. Approach to optimize project life cycle costs - save time - increase profits - improve quality - expand market share - solve problems - and use resources more effectively
product life cycle
work authorization system (Tool)
value engineering
tool
28. Collection of generally sequential project phases whose name and number are determined by the control needs of the organization involved in the project
start to start (SS)
projectized organization
project life cycle
lessons learned knowledge base
29. Risk response planning technique that indicates the project team has decided not to change the project management plan to deal with a risk - or is unable to identify any other suitable response strategy
claim
risk acceptance (Technique)
resource calendar
scope change
30. Provider of products - services or results
milestone schedule (Tool)
seller
invitation for bid (IFB)
summary activity
31. Slack - Total amount of time that a schedule activity maybe delayed from its early start date without delaying the project finish date or violating a schedule constraint.
identify risks (Process)
project quality management (Knowledge Area)
float
imposed date
32. Determining which risks may affect the project and documenting their characteristics
schedule network analysis (Technique)
role
earned value technique (EVT) (Technique)
identify risks (Process)
33. Sum of products - services and results to be provided as a project
verify scope (Process)
scope
close procurements (Process)
collect requirements (Process)
34. Documents utilized in bid and proposal activities - which include the buyer's invitation for bid - invitation for negotiations - request for information - request for quotation - request for proposal and sellers responses
hammock activity
procurement documents (Output/Input)
rolling wave planning (Technique)
virtual team
35. Logical relationship where initiation of the work of the successor schedule activity depends upon the initiation of the work of the predecessor schedule activity
finish date
monitor and controlling processes (Process Group)
verify scope (Process)
start to start (SS)
36. Indications that a risk has occurred or is about to occur. also called risk symptoms or warning signs. should be watched or monitored in the risk monitoring and control process.
summary activity
triggers
monitor and control project work (Process)
s-curve
37. Adding features and functionality (project scope) without addressing the effects on time - costs - and resources or without customer approval
scope creep
input (Process) input
estimate to complete (ETC)(Output/Input)
lessons learned knowledge base
38. Defined systematic procedure employed by a human resource to perform an activity to produce a product or result or deliver a service that may employ one or more tools
project calendar
technique
project scope
late start date (LS)
39. Defined function to be performed by a project team member
role
budget at completion (BAC)
residual risk
reserve analysis (Technique)
40. Describes each component in the work breakdown structure (WBS). for each WBS component - the WBS dictionary includes a brief definition of the scope of statement of work - defined deliverables - a list of associated activities and list of milestones.
work breakdown structure dictionary
start date
expert judgment (Technique)
risk acceptance (Technique)
41. The calculation of late finish dates and late start dates for uncompleted portions of all schedule activities. determined by working backward through the schedule network logic from the projects end date
three point estimate (Technique)
backward pass
assumptions
enterprise environmental factors (Input/Output)
42. Information gathering technique examines the project from the perspective of each projects strengths - weaknesses - opportunities - and threats to increase the breadth of the risks considered by risk management
strengths - weaknesses - opportunities - threats analysis (SWOT)
BCWP
log
communications management plan (Output/Input)
43. Collect project performance data with respect to a plan - produce performance measures and report and disseminate performance information
monitor
Monte Carlo analysis
monitor and control project work (Process)
acceptance criteria
44. An artifact that is produced - is quantifiable and can be either an end item in itself or a component item
float
perform quantitative analysis (Process)
product
work authorization
45. An entry in the work breakdown structure that can be at any level
manage stakeholder expectations (Process)
decision tree analysis (Technique)
work breakdown structure component
estimate costs (Process)
46. Describes when and how human resource requirements will be met
staffing management plan
data date
project
requirements traceability matrix
47. Logical relationship where completion of the successor schedule activity is dependent upon the initiation of the predecessor schedule activity
start date
activity
start to finish (SF)
hammock activity
48. Work breakdown structure component below the control account with known work content but without detailed schedule activities.
request for proposal (RFP)
collect requirements (Process)
output (Process)
planning package
49. Extending or generating parallel schedule network paths from the same node in a project schedule network diagram. characterized by schedule activity with more than one successor activity
co-location (Technique)
budget
path divergence
precedence diagramming method (PDM) (Technique)
50. Subsystem of overall project management system. collection of formal documented procedures that defines how project work will be authorized to ensure that the work is done by the identified organization - at the right time and in the proper sequence.
request for quotation (RFQ)
quality
work authorization system (Tool)
finish date