Test your basic knowledge |
LEED Requirements
Start Test
Study First
Subjects
:
certifications
,
construction
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. SS 5.2 Site Developement -Maximize Open Space
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Meet Green Label standards
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
2. EA 1 Optimize Energy Performance
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
3. SS 4.2 Alternative Transportation -Bike Storage and Showers
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
4. SS 8 Light Pollution Reduction
Keep at least 95% of existing bldg. structural elements-
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
5. MR 2.1 Construction Waste Management- Divert 50% from Disposal
Need CxA not member of project team unless <50 -000 s.f. building
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
Keep at least 95% of existing bldg. structural elements-
6. ID 1 Innovation in Design
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
Documented
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
7. EQ 5 Indoor Chemical and Pollutant Source Control
8. EQ 7.2 Thermal Comfort- Verification
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Reduce by 20% after meeting Energy Policy Act requirements
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
9. MR 5.1 Regional Material- 10% Extracted -Processed - and Manufactured Locally
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Use 10% bldg. materials created within 500 miles
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
10. SS 7.2 Heat Island Effect -Roof
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
Reduce by 50% Reduce use of potable water by 50%
11. EA p3 Fundamental Refrigerant Management
Need CxA not member of project team unless <50 -000 s.f. building
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
12. WE 3.1 Water Use Reduction -20% reduction
Reduce by 30% after meeting Energy Policy Act requirements
Reduce by 20% after meeting Energy Policy Act requirements
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
13. EQ 3.2 Construction IAQ Management Plan- Before Occupancy
Reduce by 30% after meeting Energy Policy Act requirements
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Meet ASHRAE 90.1-2004 stnds.
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
14. MR 4.1 Recycled Content- 10%(post-consumer + 1/2 pre-consumer)
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Need CxA not member of project team unless <50 -000 s.f. building
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Keep at least 95% of existing bldg. structural elements-
15. SS p1 Construction Activity Pollution Prevention
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
ESC plan
16. EQ p2 Environmental Tobacco Smoke (ETS) control
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
17. EQ 4.2 Low- Emitting Material- Paints and Coatings
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Reduce by 50% Reduce use of potable water by 50%
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
18. SS 2 Density and Connectivity
19. EA 6 Green Power
20. MR 3.1 Material Reuse- 5%
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
21. SS 4.1 Alternative Transportation- Public Transportation
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
22. MR 1.2 Bldg Reuse- Maintain 95% of Exisiting Wall - Floor and Roof
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Keep at least 95% of existing bldg. structural elements-
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
23. SS 1 Site Selection Avoid Inappropriate sites
24. EQ 8.1 Daylight and Views- Daylight 75% of Spaces
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
25. MR 7 Certified Wood
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
50% FCS certified wood
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
26. MR 6 Rapidly Renewable Materials
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
27. SS 4.4 Alternative Transportation -Parking Capacity
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
Reduce use of potable by 50% or treat 50% on site
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
28. EQ 2 Increased Ventilation
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
29. WE 1.2 Water Efficient Landscaping
Use 10% bldg. materials created within 500 miles
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
30. EQ 6.2 Controllability of Systems
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Reduce by 50% Reduce use of potable water by 50%
Documented
31. EQ 3.1 Construction IAQ Management Plan- Construction
32. SS 7.1 Heat Island Effect -Non Roof
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
33. MR 4.2 Recycled Content- 20%(post-consumer + 1/2 pre-consumer)
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Reduce by 50% Reduce use of potable water by 50%
34. EA 2 On-Site Renewable Energy
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
35. EA p2 Min. Energy Performance
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Meet ASHRAE 90.1-2004 stnds.
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
36. EQ 4.1 Low-Emitting Material- Adhesives and Sealants
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Use a LEED AP on team
37. MR p1 Storage and Collection of Recyclables
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Reduce by 30% after meeting Energy Policy Act requirements
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
38. EA p1 Fundamental Commissioning of Bldg. Energy Systems
Need CxA not member of project team unless <50 -000 s.f. building
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Use 20% bldg. materials created within 500 miles
Documented
39. EQ 1 Outdoor Air Delivery Monitoring
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
40. MR 1.3 Bldg. Reuse- Maintain 50% of Interrior Non-Structual Elements
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
41. SS 5.1 Site Developement -Restore or Protect Habitat
42. SS 3 Brownfields
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
Documented
43. EQ 7.1 Thermal Comfort- Design
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Meet ASHRAE 90.1-2004 stnds.
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
44. WE 2 Innovative Wastewater Technologies
Reduce use of potable by 50% or treat 50% on site
Reduce by 20% after meeting Energy Policy Act requirements
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
45. EQ 4.3 Low- Emitting Material- Carpet Systems
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Meet ASHRAE 90.1-2004 stnds.
Documented
Meet Green Label standards
46. EA 5 Measurement and Verification
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Keep at least 95% of existing bldg. structural elements-
47. WE 3.2 Water Use Reduction -30% reduction
50% FCS certified wood
Reduce by 30% after meeting Energy Policy Act requirements
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
48. MR 1.1 Bldg. Reuse- Maintain 75% of Existing Wall - Floor and Roof
Reduce by 20% after meeting Energy Policy Act requirements
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
49. ID 2 Leed Accredited Professional
50% FCS certified wood
Use a LEED AP on team
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
50. EQ 4.4 Low- Emitting Material- Composite - Wood and Agrifiber Products
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Sorry, Topic not found.:)Seach or Brouse Basicversity:
Search
Major Subjects
Tests & Exams
AP
CLEP
DSST
GRE
SAT
GMAT
Certifications
CISSP go https://www.isc2.org/
PMP
ITIL
RHCE
MCTS
More...
IT Skills
Android Programming
Data Modeling
Objective C Programming
Basic Python Programming
Adobe Illustrator
More...
Business Skills
Advertising Techniques
Business Accounting Basics
Business Strategy
Human Resource Management
Marketing Basics
More...
Soft Skills
Body Language
People Skills
Public Speaking
Persuasion
Job Hunting And Resumes
More...
Vocabulary
GRE Vocab
SAT Vocab
TOEFL Essential Vocab
Basic English Words For All
Global Words You Should Know
Business English
More...
Languages
AP German Vocab
AP Latin Vocab
SAT Subject Test: French
Italian Survival
Norwegian Survival
More...
Engineering
Audio Engineering
Computer Science Engineering
Aerospace Engineering
Chemical Engineering
Structural Engineering
More...
Health Sciences
Basic Nursing Skills
Health Science Language Fundamentals
Veterinary Technology Medical Language
Cardiology
Clinical Surgery
More...
English
Grammar Fundamentals
Literary And Rhetorical Vocab
Elements Of Style Vocab
Introduction To English Major
Complete Advanced Sentences
Literature
Homonyms
More...
Math
Algebra Formulas
Basic Arithmetic: Measurements
Metric Conversions
Geometric Properties
Important Math Facts
Number Sense Vocab
Business Math
More...
Other Major Subjects
Science
Economics
History
Law
Performing-arts
Cooking
Logic & Reasoning
Trivia
Browse all subjects
Browse all tests
Most popular tests
//
//