SUBJECTS
|
BROWSE
|
CAREER CENTER
|
POPULAR
|
JOIN
|
LOGIN
Business Skills
|
Soft Skills
|
Basic Literacy
|
Certifications
About
|
Help
|
Privacy
|
Terms
|
Email
Search
Test your basic knowledge |
LEED Requirements
Start Test
Study First
Subjects
:
certifications
,
construction
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. MR 4.1 Recycled Content- 10%(post-consumer + 1/2 pre-consumer)
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
2. SS 1 Site Selection Avoid Inappropriate sites
3. EQ 7.1 Thermal Comfort- Design
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
Reduce use of potable by 50% or treat 50% on site
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
4. EA 3 Enhanced Commissioning
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
Meet Green Label standards
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
5. MR 4.2 Recycled Content- 20%(post-consumer + 1/2 pre-consumer)
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
6. EQ 3.2 Construction IAQ Management Plan- Before Occupancy
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Need CxA not member of project team unless <50 -000 s.f. building
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
7. SS 3 Brownfields
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Documented
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
8. EA p1 Fundamental Commissioning of Bldg. Energy Systems
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
Need CxA not member of project team unless <50 -000 s.f. building
Keep at least 95% of existing bldg. structural elements-
9. EQ 8.1 Daylight and Views- Daylight 75% of Spaces
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Documented
10. EA 5 Measurement and Verification
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Reduce by 30% after meeting Energy Policy Act requirements
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
11. SS 4.1 Alternative Transportation- Public Transportation
Need CxA not member of project team unless <50 -000 s.f. building
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
12. EA 1 Optimize Energy Performance
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
50% FCS certified wood
13. MR 3.1 Material Reuse- 5%
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Use 10% bldg. materials created within 500 miles
14. EQ 3.1 Construction IAQ Management Plan- Construction
15. EQ 5 Indoor Chemical and Pollutant Source Control
16. MR 5.1 Regional Material- 10% Extracted -Processed - and Manufactured Locally
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Use 10% bldg. materials created within 500 miles
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
17. EQ 4.2 Low- Emitting Material- Paints and Coatings
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Use 20% bldg. materials created within 500 miles
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
18. MR 3.2 Material Reuse- 10%
Need CxA not member of project team unless <50 -000 s.f. building
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
50% FCS certified wood
19. MR 5.2 Regional Material- 20% Extracted - Processed - and Manufactured Locally
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Use 10% bldg. materials created within 500 miles
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
Use 20% bldg. materials created within 500 miles
20. SS 5.2 Site Developement -Maximize Open Space
Use a LEED AP on team
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
21. SS 8 Light Pollution Reduction
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Reduce by 20% after meeting Energy Policy Act requirements
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
22. WE 1.1 Water Efficienct Landscaping
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Reduce by 50% Reduce use of potable water by 50%
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
23. EA p3 Fundamental Refrigerant Management
Use 10% bldg. materials created within 500 miles
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Meet Green Label standards
24. SS 2 Density and Connectivity
25. EQ p2 Environmental Tobacco Smoke (ETS) control
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
Keep at least 95% of existing bldg. structural elements-
26. WE 2 Innovative Wastewater Technologies
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
50% FCS certified wood
Reduce use of potable by 50% or treat 50% on site
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
27. EA 4 Enhanced Refrigerant Management
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
28. EQ p1 Min. IAQ Performance
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Meet Green Label standards
29. EQ 4.3 Low- Emitting Material- Carpet Systems
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Meet Green Label standards
Reduce by 30% after meeting Energy Policy Act requirements
30. MR 1.2 Bldg Reuse- Maintain 95% of Exisiting Wall - Floor and Roof
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
Keep at least 95% of existing bldg. structural elements-
50% FCS certified wood
31. EQ 6.2 Controllability of Systems
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Meet Green Label standards
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
32. EQ 4.4 Low- Emitting Material- Composite - Wood and Agrifiber Products
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Reduce by 50% Reduce use of potable water by 50%
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
33. WE 3.2 Water Use Reduction -30% reduction
Keep at least 95% of existing bldg. structural elements-
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Reduce by 30% after meeting Energy Policy Act requirements
34. WE 3.1 Water Use Reduction -20% reduction
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
Reduce use of potable by 50% or treat 50% on site
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Reduce by 20% after meeting Energy Policy Act requirements
35. SS p1 Construction Activity Pollution Prevention
ESC plan
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
36. MR 2.1 Construction Waste Management- Divert 50% from Disposal
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Reduce by 30% after meeting Energy Policy Act requirements
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
37. SS 6.2 Stormwater Design -Quality Control
38. MR 1.3 Bldg. Reuse- Maintain 50% of Interrior Non-Structual Elements
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
39. EQ 7.2 Thermal Comfort- Verification
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
40. MR 7 Certified Wood
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
50% FCS certified wood
Keep at least 95% of existing bldg. structural elements-
41. SS 4.3 Alternative Transportation -Low emission and efficient vehicles
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
ESC plan
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
42. MR 1.1 Bldg. Reuse- Maintain 75% of Existing Wall - Floor and Roof
Reduce by 50% Reduce use of potable water by 50%
Reduce by 20% after meeting Energy Policy Act requirements
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
43. SS 5.1 Site Developement -Restore or Protect Habitat
44. EQ 4.1 Low-Emitting Material- Adhesives and Sealants
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
45. EA 6 Green Power
46. EQ 2 Increased Ventilation
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Reduce use of potable by 50% or treat 50% on site
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
47. SS 4.4 Alternative Transportation -Parking Capacity
Reduce by 20% after meeting Energy Policy Act requirements
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
48. SS 6.1 Stormwater Design -Quantity Control
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
49. EQ 1 Outdoor Air Delivery Monitoring
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
Reduce by 20% after meeting Energy Policy Act requirements
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
50. SS 7.2 Heat Island Effect -Roof
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Reduce use of potable by 50% or treat 50% on site
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Use 20% bldg. materials created within 500 miles