SUBJECTS
|
BROWSE
|
CAREER CENTER
|
POPULAR
|
JOIN
|
LOGIN
Business Skills
|
Soft Skills
|
Basic Literacy
|
Certifications
About
|
Help
|
Privacy
|
Terms
|
Email
Search
Test your basic knowledge |
LEED Requirements
Start Test
Study First
Subjects
:
certifications
,
construction
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. EQ 6.2 Controllability of Systems
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
Keep at least 95% of existing bldg. structural elements-
2. MR p1 Storage and Collection of Recyclables
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
50% FCS certified wood
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
3. SS 4.1 Alternative Transportation- Public Transportation
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
4. MR 5.1 Regional Material- 10% Extracted -Processed - and Manufactured Locally
Use 10% bldg. materials created within 500 miles
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
5. EA 4 Enhanced Refrigerant Management
Reduce by 30% after meeting Energy Policy Act requirements
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
6. EQ 4.4 Low- Emitting Material- Composite - Wood and Agrifiber Products
Use a LEED AP on team
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
7. EQ p2 Environmental Tobacco Smoke (ETS) control
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Reduce by 30% after meeting Energy Policy Act requirements
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
8. SS 3 Brownfields
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Use 20% bldg. materials created within 500 miles
Documented
9. EQ 8.2 Daylight and Views- Views for 90% of Spaces
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
Use a LEED AP on team
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
10. SS 4.3 Alternative Transportation -Low emission and efficient vehicles
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Use 20% bldg. materials created within 500 miles
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
11. MR 4.2 Recycled Content- 20%(post-consumer + 1/2 pre-consumer)
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
12. SS 4.4 Alternative Transportation -Parking Capacity
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
13. EQ 7.2 Thermal Comfort- Verification
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
14. EA p2 Min. Energy Performance
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
Meet ASHRAE 90.1-2004 stnds.
15. EQ 4.3 Low- Emitting Material- Carpet Systems
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Meet Green Label standards
16. EQ 6.1 Controllability of Systems
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
17. EA 2 On-Site Renewable Energy
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
Use a LEED AP on team
Reduce by 30% after meeting Energy Policy Act requirements
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
18. SS 6.1 Stormwater Design -Quantity Control
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
19. SS 7.2 Heat Island Effect -Roof
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
20. EQ 4.2 Low- Emitting Material- Paints and Coatings
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Use a LEED AP on team
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
21. SS 5.1 Site Developement -Restore or Protect Habitat
22. EA 5 Measurement and Verification
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
23. EA 1 Optimize Energy Performance
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
24. EQ 2 Increased Ventilation
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
25. EQ 7.1 Thermal Comfort- Design
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Need CxA not member of project team unless <50 -000 s.f. building
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
26. EQ 4.1 Low-Emitting Material- Adhesives and Sealants
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Need CxA not member of project team unless <50 -000 s.f. building
50% FCS certified wood
27. SS p1 Construction Activity Pollution Prevention
ESC plan
Reduce by 20% after meeting Energy Policy Act requirements
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
Documented
28. MR 3.2 Material Reuse- 10%
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Keep at least 95% of existing bldg. structural elements-
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
29. SS 5.2 Site Developement -Maximize Open Space
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
30. SS 2 Density and Connectivity
31. WE 1.1 Water Efficienct Landscaping
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Use 20% bldg. materials created within 500 miles
Reduce by 50% Reduce use of potable water by 50%
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
32. MR 2.1 Construction Waste Management- Divert 50% from Disposal
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
33. EQ 8.1 Daylight and Views- Daylight 75% of Spaces
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
34. EQ p1 Min. IAQ Performance
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
35. MR 1.1 Bldg. Reuse- Maintain 75% of Existing Wall - Floor and Roof
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Reduce by 30% after meeting Energy Policy Act requirements
36. ID 2 Leed Accredited Professional
Need CxA not member of project team unless <50 -000 s.f. building
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Use a LEED AP on team
37. WE 2 Innovative Wastewater Technologies
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Reduce use of potable by 50% or treat 50% on site
38. EA p3 Fundamental Refrigerant Management
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
39. WE 1.2 Water Efficient Landscaping
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
40. MR 6 Rapidly Renewable Materials
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Reduce by 30% after meeting Energy Policy Act requirements
41. SS 8 Light Pollution Reduction
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
42. EQ 5 Indoor Chemical and Pollutant Source Control
43. SS 6.2 Stormwater Design -Quality Control
44. MR 1.2 Bldg Reuse- Maintain 95% of Exisiting Wall - Floor and Roof
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Keep at least 95% of existing bldg. structural elements-
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
45. EQ 1 Outdoor Air Delivery Monitoring
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
46. MR 5.2 Regional Material- 20% Extracted - Processed - and Manufactured Locally
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
Use 20% bldg. materials created within 500 miles
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
47. SS 1 Site Selection Avoid Inappropriate sites
48. EA p1 Fundamental Commissioning of Bldg. Energy Systems
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Need CxA not member of project team unless <50 -000 s.f. building
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
49. MR 3.1 Material Reuse- 5%
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Use 10% bldg. materials created within 500 miles
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
50. EQ 3.1 Construction IAQ Management Plan- Construction