Test your basic knowledge |
LEED Requirements
Start Test
Study First
Subjects
:
certifications
,
construction
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. SS 1 Site Selection Avoid Inappropriate sites
2. MR 3.2 Material Reuse- 10%
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
3. EA 1 Optimize Energy Performance
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
4. EQ 7.1 Thermal Comfort- Design
Documented
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
5. MR 1.1 Bldg. Reuse- Maintain 75% of Existing Wall - Floor and Roof
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Use 20% bldg. materials created within 500 miles
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
6. EQ 2 Increased Ventilation
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
7. EQ 7.2 Thermal Comfort- Verification
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
8. MR 4.1 Recycled Content- 10%(post-consumer + 1/2 pre-consumer)
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
9. MR p1 Storage and Collection of Recyclables
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
10. EQ 4.2 Low- Emitting Material- Paints and Coatings
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Reduce by 20% after meeting Energy Policy Act requirements
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
11. EQ p1 Min. IAQ Performance
Use 10% bldg. materials created within 500 miles
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
12. WE 3.1 Water Use Reduction -20% reduction
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
Reduce by 20% after meeting Energy Policy Act requirements
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
13. SS 5.1 Site Developement -Restore or Protect Habitat
14. SS 4.2 Alternative Transportation -Bike Storage and Showers
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
15. EA p3 Fundamental Refrigerant Management
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
16. EQ 1 Outdoor Air Delivery Monitoring
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
17. EQ 3.2 Construction IAQ Management Plan- Before Occupancy
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Need CxA not member of project team unless <50 -000 s.f. building
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Reduce by 30% after meeting Energy Policy Act requirements
18. EQ 6.1 Controllability of Systems
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
19. MR 1.3 Bldg. Reuse- Maintain 50% of Interrior Non-Structual Elements
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Reduce by 30% after meeting Energy Policy Act requirements
20. MR 5.1 Regional Material- 10% Extracted -Processed - and Manufactured Locally
Use 10% bldg. materials created within 500 miles
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Use a LEED AP on team
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
21. EA 6 Green Power
22. MR 6 Rapidly Renewable Materials
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Need CxA not member of project team unless <50 -000 s.f. building
23. EA 2 On-Site Renewable Energy
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
Reduce by 20% after meeting Energy Policy Act requirements
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
24. SS 7.2 Heat Island Effect -Roof
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
25. EQ 6.2 Controllability of Systems
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
26. EQ 5 Indoor Chemical and Pollutant Source Control
27. EQ 4.1 Low-Emitting Material- Adhesives and Sealants
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
Meet Green Label standards
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Reduce by 50% Reduce use of potable water by 50%
28. MR 7 Certified Wood
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
50% FCS certified wood
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
29. EQ 8.1 Daylight and Views- Daylight 75% of Spaces
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
30. MR 5.2 Regional Material- 20% Extracted - Processed - and Manufactured Locally
Meet ASHRAE 90.1-2004 stnds.
Use 20% bldg. materials created within 500 miles
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
31. ID 1 Innovation in Design
Meet Green Label standards
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
32. EA 5 Measurement and Verification
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
33. SS 3 Brownfields
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Documented
34. SS 4.1 Alternative Transportation- Public Transportation
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
50% FCS certified wood
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
35. ID 2 Leed Accredited Professional
Use a LEED AP on team
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Reduce by 20% after meeting Energy Policy Act requirements
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
36. MR 2.1 Construction Waste Management- Divert 50% from Disposal
Documented
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
37. EQ 4.4 Low- Emitting Material- Composite - Wood and Agrifiber Products
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
38. SS 8 Light Pollution Reduction
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
39. SS 2 Density and Connectivity
40. MR 1.2 Bldg Reuse- Maintain 95% of Exisiting Wall - Floor and Roof
Reduce by 20% after meeting Energy Policy Act requirements
Keep at least 95% of existing bldg. structural elements-
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Meet Green Label standards
41. SS 5.2 Site Developement -Maximize Open Space
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
42. EQ 3.1 Construction IAQ Management Plan- Construction
43. MR 4.2 Recycled Content- 20%(post-consumer + 1/2 pre-consumer)
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
44. SS 4.3 Alternative Transportation -Low emission and efficient vehicles
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Meet Green Label standards
45. SS p1 Construction Activity Pollution Prevention
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
ESC plan
Keep at least 95% of existing bldg. structural elements-
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
46. EA 4 Enhanced Refrigerant Management
Keep at least 95% of existing bldg. structural elements-
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
ESC plan
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
47. SS 7.1 Heat Island Effect -Non Roof
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
48. EA 3 Enhanced Commissioning
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Reduce use of potable by 50% or treat 50% on site
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
49. SS 6.1 Stormwater Design -Quantity Control
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Reduce by 20% after meeting Energy Policy Act requirements
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
50. EQ p2 Environmental Tobacco Smoke (ETS) control
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Thermal Comfort Provide individual thermal comfort controls for 50% occupants and in multi-occupant spaces. -Operable windows can also be used if space is 20 ft. inside and 10 ft. on either side of window.
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.