Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. EQ 2 Increased Ventilation
Documented
Keep at least 95% of existing bldg. structural elements-
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
2. EA 2 On-Site Renewable Energy
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Need CxA not member of project team unless <50 -000 s.f. building
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
3. ID 1 Innovation in Design
Meet Green Label standards
Reduce by 20% after meeting Energy Policy Act requirements
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
4. EQ 7.1 Thermal Comfort- Design
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
5. EQ 6.1 Controllability of Systems
Reduce by 20% after meeting Energy Policy Act requirements
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Reduce by 50% Reduce use of potable water by 50%
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
6. SS 7.1 Heat Island Effect -Non Roof
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
Meet Green Label standards
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
7. MR 1.3 Bldg. Reuse- Maintain 50% of Interrior Non-Structual Elements
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
Reduce by 30% after meeting Energy Policy Act requirements
8. SS 6.1 Stormwater Design -Quantity Control
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Use 10% bldg. materials created within 500 miles
9. EQ 4.1 Low-Emitting Material- Adhesives and Sealants
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
10. SS 3 Brownfields
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Reduce by 30% after meeting Energy Policy Act requirements
Documented
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
11. EQ 3.2 Construction IAQ Management Plan- Before Occupancy
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Reduce use of potable by 50% or treat 50% on site
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
12. EA 1 Optimize Energy Performance
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Use a LEED AP on team
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
13. MR p1 Storage and Collection of Recyclables
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Use a LEED AP on team
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
14. EA 5 Measurement and Verification
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Reduce by 30% after meeting Energy Policy Act requirements
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
15. EQ 3.1 Construction IAQ Management Plan- Construction
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
16. EA 4 Enhanced Refrigerant Management
Need CxA not member of project team unless <50 -000 s.f. building
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
17. MR 5.2 Regional Material- 20% Extracted - Processed - and Manufactured Locally
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Use 20% bldg. materials created within 500 miles
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
18. EQ 4.2 Low- Emitting Material- Paints and Coatings
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
19. WE 3.1 Water Use Reduction -20% reduction
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Use a LEED AP on team
Reduce by 20% after meeting Energy Policy Act requirements
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
20. WE 2 Innovative Wastewater Technologies
Reduce use of potable by 50% or treat 50% on site
Meet Green Label standards
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
21. SS 2 Density and Connectivity
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
22. EA 6 Green Power
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
23. MR 7 Certified Wood
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
50% FCS certified wood
24. WE 1.2 Water Efficient Landscaping
50% FCS certified wood
Reduce use of potable by 50% or treat 50% on site
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
ESC plan
25. SS 8 Light Pollution Reduction
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Use 20% bldg. materials created within 500 miles
26. WE 3.2 Water Use Reduction -30% reduction
Reduce by 30% after meeting Energy Policy Act requirements
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
27. EQ p1 Min. IAQ Performance
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Documented
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Meet ASHRAE 90.1-2004 stnds.
28. MR 2.1 Construction Waste Management- Divert 50% from Disposal
Reduce by 50% Reduce use of potable water by 50%
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
29. EQ 1 Outdoor Air Delivery Monitoring
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
30. SS p1 Construction Activity Pollution Prevention
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
50% FCS certified wood
ESC plan
31. EQ 8.1 Daylight and Views- Daylight 75% of Spaces
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Use a LEED AP on team
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
32. EA p3 Fundamental Refrigerant Management
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
33. EA p2 Min. Energy Performance
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Use a LEED AP on team
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Meet ASHRAE 90.1-2004 stnds.
34. MR 4.1 Recycled Content- 10%(post-consumer + 1/2 pre-consumer)
50% FCS certified wood
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
35. EQ p2 Environmental Tobacco Smoke (ETS) control
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Reduce by 50% Reduce use of potable water by 50%
36. EA 3 Enhanced Commissioning
Reduce by 30% after meeting Energy Policy Act requirements
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
37. SS 4.2 Alternative Transportation -Bike Storage and Showers
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
38. MR 3.1 Material Reuse- 5%
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
39. EQ 4.4 Low- Emitting Material- Composite - Wood and Agrifiber Products
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
40. SS 7.2 Heat Island Effect -Roof
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Reduce use of potable by 50% or treat 50% on site
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
41. SS 4.4 Alternative Transportation -Parking Capacity
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
42. MR 3.2 Material Reuse- 10%
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Meet ASHRAE 90.1-2004 stnds.
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
43. EQ 7.2 Thermal Comfort- Verification
Reduce by 20% after meeting Energy Policy Act requirements
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
44. EQ 8.2 Daylight and Views- Views for 90% of Spaces
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
Achieve direct line of sight perimeter vision glazing (window) for occupants in 90% of regularly occupied spaces. -For offices the entire sq. footage can be counted if 75% or more of the area has direct line of sight to perimeter vision glazing. -For
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
45. MR 5.1 Regional Material- 10% Extracted -Processed - and Manufactured Locally
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Use 10% bldg. materials created within 500 miles
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
46. SS 5.1 Site Developement -Restore or Protect Habitat
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
47. SS 1 Site Selection Avoid Inappropriate sites
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
48. SS 4.1 Alternative Transportation- Public Transportation
Meet ASHRAE 90.1-2004 stnds.
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
ESC plan
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
49. MR 6 Rapidly Renewable Materials
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines