LEED Requirements
Start Test
Study First
Subjects
:
certifications
,
construction
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. MR 7 Certified Wood
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
50% FCS certified wood
2. SS 7.1 Heat Island Effect -Non Roof
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
3. WE 2 Innovative Wastewater Technologies
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
50% FCS certified wood
Reduce use of potable by 50% or treat 50% on site
4. SS 4.2 Alternative Transportation -Bike Storage and Showers
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Install entryway 6' grates or grills or roll mats that are regularly maintained. -Exhaust each space where hazardous gas or chemicals are present to create negative pressure and with no air recirculation. Also use self-closing doors and deck to deck
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
5. SS 7.2 Heat Island Effect -Roof
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
6. EQ 8.1 Daylight and Views- Daylight 75% of Spaces
Reduce by 20% after meeting Energy Policy Act requirements
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
7. EA 3 Enhanced Commissioning
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Use 10% bldg. materials created within 500 miles
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
8. MR 1.2 Bldg Reuse- Maintain 95% of Exisiting Wall - Floor and Roof
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
Use a LEED AP on team
Keep at least 95% of existing bldg. structural elements-
9. SS 2 Density and Connectivity
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
10. EA 5 Measurement and Verification
Use a LEED AP on team
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
Create Measurment and Verification (M&V) Plan begining occupancy/stabilization for one year
11. MR 6 Rapidly Renewable Materials
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Need CxA not member of project team unless <50 -000 s.f. building
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
12. MR 2.1 Construction Waste Management- Divert 50% from Disposal
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
ESC plan
13. WE 1.1 Water Efficienct Landscaping
Reduce by 50% Reduce use of potable water by 50%
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
14. EQ 4.2 Low- Emitting Material- Paints and Coatings
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
1. Prime Farmland 2. 50' of a waterbody 3. <5' above a floodplain 4. 100' Wetland 5. Endangered Species 6. Public Parklands
15. SS 6.1 Stormwater Design -Quantity Control
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
1. Existing impervious area 50% or < - storm water management plan that prevents post-development discharge from exceeding pre-development rates for 1 and 2 year storms OR 2. Management plan that protects receiving stream channels OR 3. Existing impe
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
16. EQ 6.1 Controllability of Systems
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
17. MR 5.2 Regional Material- 20% Extracted - Processed - and Manufactured Locally
Use 20% bldg. materials created within 500 miles
Reduce use of potable by 50% or treat 50% on site
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
18. SS 8 Light Pollution Reduction
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
Reduce by 20% after meeting Energy Policy Act requirements
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
19. EA 4 Enhanced Refrigerant Management
Use a LEED AP on team
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Use 10% bldg. materials created within 500 miles
Need CxA not member of project team unless <50 -000 s.f. building
20. SS p1 Construction Activity Pollution Prevention
ESC plan
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
21. MR 1.3 Bldg. Reuse- Maintain 50% of Interrior Non-Structual Elements
1.Bike Storage within 200 yards of front entrance for 5% peak users and showers for 0.5% Full time employees OR 2. For residential-storage for 15% of the occupants
ESC plan
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
Use at least 50% ex. Interior non-structural elements such non-struct. Walls - doors - floor coverings - and ceiling coverings.
22. EQ 4.1 Low-Emitting Material- Adhesives and Sealants
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
23. EQ 2 Increased Ventilation
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
35% building's electricity form renewable sources with at least a 2 year contract. Determine baseline use with results from EA1 or CBECs.
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
24. MR p1 Storage and Collection of Recyclables
Meet ASHRAE 90.1-2004 stnds.
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
1. For interior: angle of maximum candela must intersect opaque building interior surfaces OR 2. All non-emergency interior lights shall be auto controlled to turn off during non-business hours
25. ID 2 Leed Accredited Professional
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Use a LEED AP on team
1. dev. and 60 -000sq'/acre OR 2. 1/2 Mile of resident area w/ 10 dwelling units/ acre AND 10 basic services
26. EQ p2 Environmental Tobacco Smoke (ETS) control
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
Reduce by 30% after meeting Energy Policy Act requirements
No Potable Water Use or No Irrigation Reduce by 100% or use landscaping that does not require perm. Irrigation system
27. EA 2 On-Site Renewable Energy
Reduce by 20% after meeting Energy Policy Act requirements
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Offset energy costs with on-site power sources. Ground source heat pump and passive solar do not apply or green power certificates
28. MR 1.1 Bldg. Reuse- Maintain 75% of Existing Wall - Floor and Roof
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
Need CxA not member of project team unless <50 -000 s.f. building
29. ID 1 Innovation in Design
Reduce by 50% Reduce use of potable water by 50%
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Documented
30. SS 5.1 Site Developement -Restore or Protect Habitat
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
31. EA p2 Min. Energy Performance
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
Meet ASHRAE 90.1-2004 stnds.
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
32. EQ 7.2 Thermal Comfort- Verification
1. No refridgerants 2. Choose refrigerants that are less damaging to ozone per formula 3. Efficient Equipment 4. Minimize Leakage 5. Long product life cycle
1. Mech. Vent. Areas- Increase outdoor ventilation rates to all occupied spaces by 30% over req. for at least 90% occupied spaces 2. Natural Vent.-Meet recs. In Carbon - or effectiveness flow diagrams is in CIBSE.
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
33. MR 4.2 Recycled Content- 20%(post-consumer + 1/2 pre-consumer)
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
Storm water runoff management plan that treats 90% average runoff with Best Management Practices (BMP's). BMP's must be able to remove 80% total suspended solids Ex. green roofs.
Post-Consumer plus 1/2 Pre-Consumer>/=20% based on recycled content value
6 tasks in addn. to EAp1 -Independent CxA -CxA design review of OPR - BOD - and design documents prior to mid-construction -CxA review contractor submittals for compliance with OPR and BOD -Develop systems manual -Verify training is complete CxA revi
34. EQ 3.1 Construction IAQ Management Plan- Construction
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
35. SS 4.1 Alternative Transportation- Public Transportation
Reduce use of potable by 50% or treat 50% on site
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
Meet Green Label standards
36. SS 3 Brownfields
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Documented
Contain no urea-formaldehyde in particle board - plywood - MDF - wheatboard - panel substrate - and door cores. Furniture not included
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
37. WE 3.1 Water Use Reduction -20% reduction
Create recycling station that serves whole blg including paper - glass - metal - cardboard - plastic
Use 2.5% materials based on 10 yr. growth cycle Bamboo - cotton - wool - strawboard - wheatboard - agrifiber - linoleum - cork
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Reduce by 20% after meeting Energy Policy Act requirements
38. SS 4.3 Alternative Transportation -Low emission and efficient vehicles
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
Limit Greenfield disturbances to: 40'or < of building perimeter - 10' or < hard non-roads (walkways) - 15'< road curbs - 25' < pervious constructed areas OR Restore 50% site area on redevelopment sites - not including building footprint
1. Provide vehicles for 3% of the Full Time Employees and preferred parking OR 2. Provide 5% total spaces as preferred parking for low emitting and fuel efficient cars OR 3. Install alternate fueling station for 3% of the total parking
1. 1/2 mile from rail OR 2. 1/4 mile from 2 or more bus stops for 2 or more bus lines
39. EA p3 Fundamental Refrigerant Management
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
Post-Consumer plus 1/2 Pre-Consumer>/=10% based on recycled content value -only include perm. Installed and no mech/electrical
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
40. EA 1 Optimize Energy Performance
1. Prohibit inside and locate outside areas at least 25 ft. away from bldg 2. Designate area in bldg with direct exhaust to outside and enclosed deck to deck partitions-negative pressure 3. Residential- Prohibit in common areas - seals between units
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
1. Whole bldg. energy simulation using ASHRAE as baseline- do not use energy cost budget method-up to 42% efficiency improvement 2. Prescriptive Compliance Path for offices<20 -000 -simple to use no calculations-choose correct climate zone 3. Prescri
ESC plan
41. EQ 1 Outdoor Air Delivery Monitoring
Lighting Provide individual lighting controls for 90% occupants and in multi-occupant spaces.-ideally repositionable
50% FCS certified wood
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
Must create your own intent - requirements - ect.... -Must display that exceed LEED requirements or show strong innovation or creativity/uniqueness of green design
42. EQ p1 Min. IAQ Performance
Reduce by 30% after meeting Energy Policy Act requirements
Meet Green Label standards
Meet min. stnds ASHRAE -mech. Vent. Systems shall be designed with Vent. Rate Procedure
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
43. MR 3.2 Material Reuse- 10%
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
For 50% hardscape provide any of the following: 1. Shade within 5yrs OR 2. Paving with SRI=>29 OR 3. 50% Open grid paving OR 4. Minimum of 50% of the parking underground with an SRI=>29 roof
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
All adhesives and sealants shall comply with South Coast Air Quality Mgt. District -OK to go over VOC limit with one item if can meet the VOC budget across the board with all material
44. SS 5.2 Site Developement -Maximize Open Space
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Interior paints - coatings - and primers just adhere to Green Seal GS-11 stnds.
Survey within 6-18 months of occupancy for occupant satisfaction with thermal comfort. -If more than 20% are unhappy - make corrective plan
1. Reduce development footprint and/or provide vegetation Open Space >25% of zoning requirements OR 2. if no local zoning - create area adjacent to the building => building footprint OR 3. If no zoning open space requirements then create the open spa
45. SS 6.2 Stormwater Design -Quality Control
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
46. WE 3.2 Water Use Reduction -30% reduction
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Develop IAQ Mgt Plan - meeting SMACNA's guide -If perm. Air handlers used during construction use filters with MERV 8 and changed prior to occupancy
Reduce by 30% after meeting Energy Policy Act requirements
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
47. EA 6 Green Power
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
48. EQ 3.2 Construction IAQ Management Plan- Before Occupancy
Achieve min. daylight factor of 2% in 75% of all space occupied for critical visual tasks OR OR -Thru computer simulation - demo that 25 horiz. footcandles has been achieved under clear sky conditions at tnoon at the equinox at 30" above floor and fo
1. Use roofing materials with an SRI=> LOW SLOPE 78 or High Slope 29 OR 2. 50% green roof OR 3. Combo of the 2
Reused materials for at least 10% of total bldg. material cost (based on replacement value)
Develop and implement IAQ Mgt. Plan and 1. Flush out w/14 -000 cu ft. outdoor air/s.f. with temperature at least 60 degs. and humidity not>60%. OR If want to occupy quickly deliver 3 -500 cu.ft. air and more at least every 3 hrs. until 14 -000 cu ft.
49. MR 3.1 Material Reuse- 5%
Install permanant Monitoring for ventilation systems and make sure min. reqs. are met -Alarm generated if varies by 10%. Audible - Visual - auto alarm to operations management.
1. Non-residential - Do Not exceed zoning requirements OR 2. If there is parking for < 5% of the Full Time Employees - provide preferred parking for car and van pool for 5% of the total spaces OR 3. Residential- Do not exceed zoning requirements and
Reused materials for at least 5% of total bldg. material cost (based on replacement value) -exclude mech and elec.
Reduce by 30% after meeting Energy Policy Act requirements
50. EQ 7.1 Thermal Comfort- Design
No CFCs or five year phase-out plan or not if can show that replacement costs cannot be not be paid back in energy savings within 10 years
Divert 50% waste from construction and demo-recycle or salvage. -Develop and implement Constr. Waste Mgt plan -Divert 75% waste from construction and demo.-recycle or salvage
Design HVAC and building envelops to meet ASHRAE 55-2004 based on predicted mean comfort level
Keep at least 75% of existing bldg. structural elements-floor - roof decking - exterior skin & framing- excludes windows and non-structural roof.