Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. display project guide
Calendar Tab - used to specify the end time - default setting is 5pm
Security tab - enables a user to define how MSP shoudl handle legacy and non-default file formats. MPW formats will not open in 2007
Calculation tab - specifies whether MSP recalculates the acrtive project or all open projects.
Interface tab - used to diplsy the side pane containing the Project Guide. this is a global setting and applies to all project - default is checked
2. Service options button
General Tab - used to change cutomer feedback and document management options
Calculation tab - specifies whether calculations are done automatically or manually.
Project Information - used to indicate how readily tasks in the current project are delayed whe resources are leveled across multiple projects. a number between 0 and 1000. the higher the number the higher the priority
Interface tab - used to specify that the feedback triangle should appear in a corner of tasks name field if the task's start date or finish dates is changed. default is checked.
3. Inserted project are calculated like summary tasks
Schedule tab - it displays a question mark for estimated duration. default - checked
Interface tab - used to specify that the feedback triangle should appear in a corner of tasks name field if the task's start date or finish dates is changed. default is checked.
Calculation tab - used to specify a single critical path throughout the master project (Treating inserted projects as summary tasks in the master project) default is checked.
Schedule tab - specifies that all new tasks have estimated durations.
4. Calculation mode
View Tab - used to specify which currency symbol to be used - default is $
General Tab - used to set the number of recetnly opened project file that are listed at the bottom of the file. Default is 4 project file names
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
Calculation tab - specifies whether calculations are done automatically or manually.
5. Tasks will always honor their constraint dates
View Tab - used to specify the view that is diplayed at startup - Default is Gantt Chart
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
Schedule tab - specifies that MSP schedules tasks according to their constraint dates
6. Split in progress tasks
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
View Tab - used to specify which type of currency is being used - default is USD
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
Schedule tab - allows rescheduling of remaining duration and work when a task slips or reports progress ahead of shedule. default - checked
7. Schedule from
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
Calculation tab - specifies whether calculations are done automatically or manually.
Project Information - used to specify whether to project is scheduled from a project start date or a project finish date. default is start date
Calendar Tab - used to specify the month that begins the fiscal year. MSP displays years based on fiscal year. Default is January
8. Work is entered in
Schedule tab - whether to show resource assignment units as decimal or percentage. Default - percentage
View Tab - used to specify the format for displaying dates in all project files. Default format is Mon 1/23/02
Project Information - used to specify the start date of the current project. - only available if the "Schedule from" drop down is "Project Start Date" MSP will calculate the finish date with ASAP constraint.
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Work
9. Status date
Project Information - used to specify whether to project is scheduled from a project start date or a project finish date. default is start date
Calculation tab - used to recalculate based on the calculation mode and calculate options.
Project Information - used to specify the status date. The status date is used to perform earned value calculations - identify the complete through date in the Update project dialog box. and place progressline. if the status date is set to NA then cu
Calculation tab - for tasks that were schedule to start before the status date but actually started late. remaining port of the task moves forward to start at the status date. by default is cleared
10. Finish date
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
Calendar Tab - used to label the fiscal year using the calend ear in which the fiscal eyar begins. by default is cleared
View Tab - used to specify the view that is diplayed at startup - Default is Gantt Chart
Project Information - used to specify the finish date of the current project. only available if the "Schedule from" drop down is "Project Finish date" MSP will calculat the start date with ALAP constraints
11. Default task type
Schedule tab - used to specify the default start date for new tasks as they are entered in the current project. Project Start Date/no constraint - Start on Current Date/a Start No Earlier Than constraint (using the current date)
Calculation tab - goes with "move start of remaining parts before status date forward to status date;" - remaing portion of the task moves forward to start at the status date. default is cleared
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
Calendar Tab - used to specify the start time - the default setting is 8am
12. Autolink inserted or moved tasks
Project Information - used to specify the start date of the current project. - only available if the "Schedule from" drop down is "Project Start Date" MSP will calculate the finish date with ASAP constraint.
Schedule tab - when checked - automatically links tasks again when a user cuts - moves - or inserts them. this applies only to contiguous finish to start task relationships. default/checked
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
General Tab - used to specify the standard pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
13. Show section
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
View Tab - used to specify which currency symbol to be used - default is $
View Tab - used to specify which interface elements should be displyed or hidden. global setting - default is all are selected. - elements are - status bar - windows in taskbar - bars and shapes in gantt vies in 3d - scroll bars - entry bar - OLE lin
14. Calendar
Calendar Tab - used to define the number of hours assigned whan a duration of one day is entered - default is 8h
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
Schedule tab - when checked - automatically links tasks again when a user cuts - moves - or inserts them. this applies only to contiguous finish to start task relationships. default/checked
Project Information - used to specify the base calendar to be used for the proejct calendar
15. Default standard rate
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Work
Calendar Tab - used to define the number of datys assigned to a task when a duration of one month is entered. Default is 20
General Tab - used to specify the standard pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
16. Default task type
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Work
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Used to specify whether the side pane displays the project default main page or a custom page developed by the organization
17. Automatically add new resources and task
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
Calendar Tab - used to define the number of datys assigned to a task when a duration of one month is entered. Default is 20
Project Information - used to specify the base calendar to be used for the proejct calendar
General Tab - used to turn on autofilter automatically when a new project is created - default is cleared
18. Date format
Calendar Tab - used to define the number of hours assigned whan a duration of one day is entered - default is 8h
View Tab - used to specify the format for displaying dates in all project files. Default format is Mon 1/23/02
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
Schedule tab - allows rescheduling of remaining duration and work when a task slips or reports progress ahead of shedule. default - checked
19. Earned value
General Tab - used to change cutomer feedback and document management options
Used to specify whether the side pane displays the project default main page or a custom page developed by the organization
Calculation tab - used to recalculate based on the calculation mode and calculate options.
Calculation tab - user can specify whether % complete or Physical % Complete should be used for earned value analysis in this project
20. Default overtime rate
Calendar Tab - used to define the number of hours assigned whan a duration of one day is entered - default is 8h
Calculation tab - goes with "move end of completed parts after status date back to status date". The remaining portion of the task moves back to start at the status date otherwise it will complete as planned. by dfault is cleared
Schedule tab - allows rescheduling of remaining duration and work when a task slips or reports progress ahead of shedule. default - checked
General Tab - used to specify the overtime pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
21. Updating task status updates resource status
Calculation tab - user can specify whether % complete or Physical % Complete should be used for earned value analysis in this project
Calendar Tab - used to specify the day of the week on twhich the scheduleing week begins
Calculation tab - MSP will automatically update resource status (Actual - remaining work or cost) whenever you update task status default is checked
View Tab - used to specify which type of currency is being used - default is USD
22. Advice from planning wizard
Schedule tab - used to specify the default start date for new tasks as they are entered in the current project. Project Start Date/no constraint - Start on Current Date/a Start No Earlier Than constraint (using the current date)
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
Calculation tab - specifies that MSP calculates actual costs automatically based upon resource rates - per-use resourcee costs and fixed task costs. If checked - a user cannot enter any additional acutal cost until the task is 100% complete. Default
Interface tab - the project elements are matched in the organizer by using each element's internal ID. By selecting - the physical element names are ignored as they may differ between projects
23. Open last file on startup
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
General Tab - automatically opens the last proejct file that was used. Default is cleared (if cleared project creates a new project whenever it starts)
Calculation tab - used to recalculate based on the calculation mode and calculate options.
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
24. Move start of remaining parts before status date forward to status date
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
View Tab - used to specify the position of the currency symbol. default is just before amount
Calculation tab - for tasks that were schedule to start before the status date but actually started late. remaining port of the task moves forward to start at the status date. by default is cleared
General Tab - used to specify the standard pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
25. Macro security
General Tab - used to change cutomer feedback and document management options
Project Information - used to specify the finish date of the current project. only available if the "Schedule from" drop down is "Project Finish date" MSP will calculat the start date with ALAP constraints
Project Information - used to specify the current date. by default this is the computer date and time
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
26. Show links between projects dialog box on open
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
General Tab - used to set the number of recetnly opened project file that are listed at the bottom of the file. Default is 4 project file names
Schedule tab - it displays a question mark for estimated duration. default - checked
27. Project Guide Functionality and layout page
Schedule tab - specifies that all new tasks have estimated durations.
Interface tab - used to specify that the delete indicator should appear in the indicators field if the text in the task name or resource name field is deleted - default is checked
Used to specify whether the side pane displays the project default main page or a custom page developed by the organization
Schedule tab - causes MSP displays messages about schedule inconsistencies - Default is checked
28. New tasks
Schedule tab - used to specify the default start date for new tasks as they are entered in the current project. Project Start Date/no constraint - Start on Current Date/a Start No Earlier Than constraint (using the current date)
View Tab - it is used to specify the number of digits that should appear after the decimal - default is 2
Project Information - used to indicate how readily tasks in the current project are delayed whe resources are leveled across multiple projects. a number between 0 and 1000. the higher the number the higher the priority
General Tab - used to change cutomer feedback and document management options
29. Show outline number
Project Information - used to specify the start date of the current project. - only available if the "Schedule from" drop down is "Project Start Date" MSP will calculate the finish date with ASAP constraint.
View Tab - used to specify the format for displaying dates in all project files. Default format is Mon 1/23/02
View Tab - used to display the outline number next to each task name - default is cleared
Interface tab - used to specify that the feedback triangle should appear in a corner of tasks name field if the task's start date or finish dates is changed. default is checked.
30. Move end of completed parts after status date back to status date
Calculation tab - this is for tasks that were scheduled to start after the status date but actually started early. the completed portion of the task moves back to the finish at the status date. Defaulted is cleared.
View Tab - used to display summary tasks. default is check
General Tab - used to set the number of change leverls a user can undo and redo - default is 20
Calendar Tab - used to label the fiscal year using the calend ear in which the fiscal eyar begins. by default is cleared
31. Show outline symbol
Project Information - used to open the project statistics dialog box. is used to review scheduled and actual start and finish date - durations - work and cost.
View Tab - used to display outline symbols next to each task name (A plus sign is displayed next to rolled up summary tasks and a minus sign next to summary tasks showing their subtasks) By default is checked.
Schedule tab - specifies that MSP schedules tasks according to their constraint dates
View Tab - used to indent the names of subtasks in the task name - default is checked
32. Show external predecessors
Schedule tab - specifies that MSP schedules tasks according to their constraint dates
View Tab - used to specify whether external predecessor tasks are show in the current project - default is checked
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Work
General Tab - used to specify the overtime pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
33. Duration is entered in
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Duration
Interface tab - the project elements are matched in the organizer by using each element's internal ID. By selecting - the physical element names are ignored as they may differ between projects
Calculation tab - for tasks that were schedule to start before the status date but actually started late. remaining port of the task moves forward to start at the status date. by default is cleared
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
34. Legacy formats section
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
Security tab - enables a user to define how MSP shoudl handle legacy and non-default file formats. MPW formats will not open in 2007
View Tab - it is used to specify the number of digits that should appear after the decimal - default is 2
Schedule tab - used to specify the default start date for new tasks as they are entered in the current project. Project Start Date/no constraint - Start on Current Date/a Start No Earlier Than constraint (using the current date)
35. Priority
Project Information - used to indicate how readily tasks in the current project are delayed whe resources are leveled across multiple projects. a number between 0 and 1000. the higher the number the higher the priority
Project Information - used to specify the finish date of the current project. only available if the "Schedule from" drop down is "Project Finish date" MSP will calculat the start date with ALAP constraints
View Tab - used to display outline symbols next to each task name (A plus sign is displayed next to rolled up summary tasks and a minus sign next to summary tasks showing their subtasks) By default is checked.
View Tab - used to display the outline number next to each task name - default is cleared
36. Current date
Schedule tab - when checked - automatically links tasks again when a user cuts - moves - or inserts them. this applies only to contiguous finish to start task relationships. default/checked
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
Project Information - used to specify the current date. by default this is the computer date and time
Calculation tab - used to recalculate based on the calculation mode and calculate options.
37. Days per month
Calendar Tab - used to define the number of datys assigned to a task when a duration of one month is entered. Default is 20
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
38. Edits to start and finishe dates
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
39. And move start of remaining parts back to status date
Calculation tab - goes with "move end of completed parts after status date back to status date". The remaining portion of the task moves back to start at the status date otherwise it will complete as planned. by dfault is cleared
General Tab - used to set project to open the project information dialog box whenever a new project is created
Project Information - used to specify the start date of the current project. - only available if the "Schedule from" drop down is "Project Start Date" MSP will calculate the finish date with ASAP constraint.
Used to specify whether the side pane displays the project default main page or a custom page developed by the organization
40. New tasks are effort driven
Schedule tab - specifies that MSP schedules tasks according to their constraint dates
Project Information - used to specify whether to project is scheduled from a project start date or a project finish date. default is start date
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Work
Schedule tab - specifies that new tasks are scheduled such that the work on the task remains constant as a user adds or removes assignments. - if checked - adding or removing resource assignments on a fixed units taks has no effect on task duration.
41. Tasks are critical if slack is less than or equal to [x] days
Calendar Tab - used to specify the month that begins the fiscal year. MSP displays years based on fiscal year. Default is January
General Tab - automatically opens the last proejct file that was used. Default is cleared (if cleared project creates a new project whenever it starts)
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
42. Use starting year for FY numbering
View Tab - used to display the outline number next to each task name - default is cleared
View Tab - used to specify the view that is diplayed at startup - Default is Gantt Chart
Calendar Tab - used to label the fiscal year using the calend ear in which the fiscal eyar begins. by default is cleared
View Tab - used to specify the type of calendar- default is Gregorian 12 month calend start on January 1
43. Use internal IDs to match different-language or renamed ORganizer items between projects
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
44. Remove inforamtion form file properties on save
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
Interface tab - used to specify that the delete indicator should appear in the indicators field if the text in the task name or resource name field is deleted - default is checked
Security tab - enables a user to define how MSP shoudl handle legacy and non-default file formats. MPW formats will not open in 2007
Calculation tab - Used to specify how MSP sets the fixed cost accrual for new tasks. Accrued at the start of a task - prorated throughout - accrued at the end of a task - default is prorated
45. Show project summary task
Calculation tab - for tasks that were schedule to start before the status date but actually started late. remaining port of the task moves forward to start at the status date. by default is cleared
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
View Tab - used to specify whether a project level summary task is to be displayed. It would have an ID of 0. Default is cleared
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Duration
46. Automatically accept new external data
Security tab - enables a user to define how MSP shoudl handle legacy and non-default file formats. MPW formats will not open in 2007
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Interface tab - used to specify that the feedback triangle should appear in a corner of a field if additional resources are assigned to a task that already has assigned resources - default - checked.
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
47. Prompt for project infor for new projects
Calendar Tab - used to specify the start time - the default setting is 8am
Schedule tab - when checked - automatically links tasks again when a user cuts - moves - or inserts them. this applies only to contiguous finish to start task relationships. default/checked
General Tab - used to set project to open the project information dialog box whenever a new project is created
View Tab - used to display summary tasks. default is check
48. Placement
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Calculation tab - used to specify a single critical path throughout the master project (Treating inserted projects as summary tasks in the master project) default is checked.
View Tab - used to specify the position of the currency symbol. default is just before amount
Schedule tab - whether to show resource assignment units as decimal or percentage. Default - percentage
49. User name
View Tab - used to specify the format for displaying dates in all project files. Default format is Mon 1/23/02
View Tab - used to specify whether a project level summary task is to be displayed. It would have an ID of 0. Default is cleared
General Tab - used to display the user name entered when project was installed (the user name can be changed by typing a new name in this box.
Interface tab - used to specify that the delete indicator should appear in the indicators field if the text in the task name or resource name field is deleted - default is checked
50. Resource Assignments
View Tab - used to specify which type of currency is being used - default is USD
Interface tab - used to specify that the feedback triangle should appear in a corner of tasks name field if the task's start date or finish dates is changed. default is checked.
Calculation tab - specifies whether MSP recalculates the acrtive project or all open projects.
Interface tab - used to specify that the feedback triangle should appear in a corner of a field if additional resources are assigned to a task that already has assigned resources - default - checked.