Test your basic knowledge |
Microsoft Project
Start Test
Study First
Subjects
:
certifications
,
it-skills
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. Show that tasks have estimated durations
Security tab - ensures that any project server or workspace sites specified on the collaborate tab of the option dialog box will be added to the list
Schedule tab - whether to show resource assignment units as decimal or percentage. Default - percentage
Schedule tab - specifies that all new tasks have estimated durations.
Schedule tab - it displays a question mark for estimated duration. default - checked
2. Show outline number
View Tab - used to specify the format for displaying dates in all project files. Default format is Mon 1/23/02
View Tab - used to display the outline number next to each task name - default is cleared
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
View Tab - used to indent the names of subtasks in the task name - default is checked
3. Calculate multiple critcial paths
Calculation tab - specifies that MSP should calculate and display a critical path for each independent network of tasks. default is cleared
Project Information - used to specify the status date. The status date is used to perform earned value calculations - identify the complete through date in the Update project dialog box. and place progressline. if the status date is set to NA then cu
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Work
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
4. Set autofilter on for new projects
Calendar Tab - used to define the number of hours assigned whan a duration of one day is entered - default is 8h
General Tab - used to change cutomer feedback and document management options
General Tab - used to set project to open the project information dialog box whenever a new project is created
General Tab - used to turn on autofilter automatically when a new project is created - default is cleared
5. Recently used file list
General Tab - used to set the number of recetnly opened project file that are listed at the bottom of the file. Default is 4 project file names
Calculation tab - specifies whether MSP recalculates the acrtive project or all open projects.
Schedule tab - causes MSP displays messages about schedule inconsistencies - Default is checked
General Tab - used to specify the overtime pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
6. Show section
Project Information - used to open the project statistics dialog box. is used to review scheduled and actual start and finish date - durations - work and cost.
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
View Tab - used to specify which interface elements should be displyed or hidden. global setting - default is all are selected. - elements are - status bar - windows in taskbar - bars and shapes in gantt vies in 3d - scroll bars - entry bar - OLE lin
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
7. Automatically add new resources and task
Project Information - used to indicate how readily tasks in the current project are delayed whe resources are leveled across multiple projects. a number between 0 and 1000. the higher the number the higher the priority
Calculation tab - Used to specify how MSP sets the fixed cost accrual for new tasks. Accrued at the start of a task - prorated throughout - accrued at the end of a task - default is prorated
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
Security tab - ensures that any project server or workspace sites specified on the collaborate tab of the option dialog box will be added to the list
8. Move start of remaining parts before status date forward to status date
Calculation tab - for tasks that were schedule to start before the status date but actually started late. remaining port of the task moves forward to start at the status date. by default is cleared
Schedule tab - specifies that all new tasks have estimated durations.
View Tab - used to indent the names of subtasks in the task name - default is checked
Project Information - used to specify the finish date of the current project. only available if the "Schedule from" drop down is "Project Finish date" MSP will calculat the start date with ALAP constraints
9. Show project summary task
Schedule tab - default for Unit of time (Minutes - hours - days - weeks - or month) in Duration
View Tab - used to specify whether a project level summary task is to be displayed. It would have an ID of 0. Default is cleared
Calculation tab - specifies whether calculations are done automatically or manually.
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
10. Week starts on
View Tab - used to display the outline number next to each task name - default is cleared
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
Calculation tab - goes with "move end of completed parts after status date back to status date". The remaining portion of the task moves back to start at the status date otherwise it will complete as planned. by dfault is cleared
Calendar Tab - used to specify the day of the week on twhich the scheduleing week begins
11. Current date
Project Information - used to specify the current date. by default this is the computer date and time
Calculation tab - specifies that MSP should calculate and display a critical path for each independent network of tasks. default is cleared
View Tab - used to indent the names of subtasks in the task name - default is checked
View Tab - used to specify the position of the currency symbol. default is just before amount
12. Fiscal year starts in
General Tab - used to set project to open the project information dialog box whenever a new project is created
Calculation tab - specifies whether calculations are done automatically or manually.
Schedule tab - it displays a question mark for estimated duration. default - checked
Calendar Tab - used to specify the month that begins the fiscal year. MSP displays years based on fiscal year. Default is January
13. Symbol
View Tab - used to specify which currency symbol to be used - default is $
Project Information - used to specify the finish date of the current project. only available if the "Schedule from" drop down is "Project Finish date" MSP will calculat the start date with ALAP constraints
Schedule tab - when checked - automatically links tasks again when a user cuts - moves - or inserts them. this applies only to contiguous finish to start task relationships. default/checked
View Tab - it is used to specify the number of digits that should appear after the decimal - default is 2
14. Edits to start and finishe dates
15. Placement
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
View Tab - used to display outline symbols next to each task name (A plus sign is displayed next to rolled up summary tasks and a minus sign next to summary tasks showing their subtasks) By default is checked.
Calendar Tab - used to label the fiscal year using the calend ear in which the fiscal eyar begins. by default is cleared
View Tab - used to specify the position of the currency symbol. default is just before amount
16. Calendar type
Calendar Tab - used to specify the month that begins the fiscal year. MSP displays years based on fiscal year. Default is January
View Tab - used to specify whether a project level summary task is to be displayed. It would have an ID of 0. Default is cleared
View Tab - used to specify the type of calendar- default is Gregorian 12 month calend start on January 1
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
17. Automatically accept new external data
General Tab - automatically opens the last proejct file that was used. Default is cleared (if cleared project creates a new project whenever it starts)
View Tab - used to specify whether external successor tasks are shown in the current project - default is checked
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Calculation tab - specifies that MSP calculates actual costs automatically based upon resource rates - per-use resourcee costs and fixed task costs. If checked - a user cannot enter any additional acutal cost until the task is 100% complete. Default
18. Tasks are critical if slack is less than or equal to [x] days
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
Interface tab - used to diplsy the side pane containing the Project Guide. this is a global setting and applies to all project - default is checked
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
General Tab - used to specify the overtime pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
19. Remove inforamtion form file properties on save
Project Information - used to specify the current date. by default this is the computer date and time
View Tab - used to specify the type of calendar- default is Gregorian 12 month calend start on January 1
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
Calculation tab - specifies whether calculations are done automatically or manually.
20. Default standard rate
Calculation tab - specifies that MSP calculates actual costs automatically based upon resource rates - per-use resourcee costs and fixed task costs. If checked - a user cannot enter any additional acutal cost until the task is 100% complete. Default
Calculation tab - this is for tasks that were scheduled to start after the status date but actually started early. the completed portion of the task moves back to the finish at the status date. Defaulted is cleared.
General Tab - used to specify the standard pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
21. Advice from planning wizard
General Tab - used to display the user name entered when project was installed (the user name can be changed by typing a new name in this box.
Schedule tab - specifies that MSP schedules tasks according to their constraint dates
Project Information - used to specify the current date. by default this is the computer date and time
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
22. Use internal IDs to match different-language or renamed ORganizer items between projects
23. Updating task status updates resource status
Project Information - used to specify the current date. by default this is the computer date and time
General Tab - used to specify the overtime pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
General Tab - used to specify the standard pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
Calculation tab - MSP will automatically update resource status (Actual - remaining work or cost) whenever you update task status default is checked
24. Deletions in the name column
Interface tab - used to specify that the feedback triangle should appear in a corner of the duration field or the task name field if task's work - units - or duration is changed. Default is checked
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
Interface tab - used to specify that the delete indicator should appear in the indicators field if the text in the task name or resource name field is deleted - default is checked
Interface tab - used to specify that the feedback triangle should appear in a corner of tasks name field if the task's start date or finish dates is changed. default is checked.
25. Tasks will always honor their constraint dates
Project Information - used to specify the status date. The status date is used to perform earned value calculations - identify the complete through date in the Update project dialog box. and place progressline. if the status date is set to NA then cu
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
Schedule tab - specifies that MSP schedules tasks according to their constraint dates
Interface tab - used to specify that the feedback triangle should appear in a corner of a field if additional resources are assigned to a task that already has assigned resources - default - checked.
26. Status date
Calendar Tab - used to specify the month that begins the fiscal year. MSP displays years based on fiscal year. Default is January
Security tab - ensures that any project server or workspace sites specified on the collaborate tab of the option dialog box will be added to the list
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
Project Information - used to specify the status date. The status date is used to perform earned value calculations - identify the complete through date in the Update project dialog box. and place progressline. if the status date is set to NA then cu
27. And move end of completed parts forward to status date
Calculation tab - goes with "move start of remaining parts before status date forward to status date;" - remaing portion of the task moves forward to start at the status date. default is cleared
Project Information - used to specify the current date. by default this is the computer date and time
Schedule tab - used to specify the default start date for new tasks as they are entered in the current project. Project Start Date/no constraint - Start on Current Date/a Start No Earlier Than constraint (using the current date)
Security tab - ensures that any project server or workspace sites specified on the collaborate tab of the option dialog box will be added to the list
28. Show external successors
View Tab - used to display summary tasks. default is check
Project Information - used to specify the current date. by default this is the computer date and time
Calendar Tab - used to specify the end time - default setting is 5pm
View Tab - used to specify whether external successor tasks are shown in the current project - default is checked
29. Default overtime rate
View Tab - used to specify which currency symbol to be used - default is $
Project Information - used to specify the base calendar to be used for the proejct calendar
Schedule tab - whether to show resource assignment units as decimal or percentage. Default - percentage
General Tab - used to specify the overtime pay rate for new resources. can be overridden by typing a different rate in the resource form view - resource information dialog box or resource sheet. default is $0/h
30. Default view
Interface tab - used to specify that the feedback triangle should appear in a corner of tasks name field if the task's start date or finish dates is changed. default is checked.
View Tab - used to specify the view that is diplayed at startup - Default is Gantt Chart
Project Information - used to specify the status date. The status date is used to perform earned value calculations - identify the complete through date in the Update project dialog box. and place progressline. if the status date is set to NA then cu
Calendar Tab - used to define the number of datys assigned to a task when a duration of one month is entered. Default is 20
31. Undo levels
General Tab - used to set the number of change leverls a user can undo and redo - default is 20
Calculation tab - Used to specify how MSP sets the fixed cost accrual for new tasks. Accrued at the start of a task - prorated throughout - accrued at the end of a task - default is prorated
View Tab - used to specify which currency symbol to be used - default is $
View Tab - used to specify which type of currency is being used - default is USD
32. Resource Assignments
Project Information - used to specify whether to project is scheduled from a project start date or a project finish date. default is start date
View Tab - used to specify the view that is diplayed at startup - Default is Gantt Chart
Project Information - used to specify the status date. The status date is used to perform earned value calculations - identify the complete through date in the Update project dialog box. and place progressline. if the status date is set to NA then cu
Interface tab - used to specify that the feedback triangle should appear in a corner of a field if additional resources are assigned to a task that already has assigned resources - default - checked.
33. Hours per day
Schedule tab - whether to show resource assignment units as decimal or percentage. Default - percentage
Calendar Tab - used to define the number of hours assigned whan a duration of one day is entered - default is 8h
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
Schedule tab - specifies that all new tasks have estimated durations.
34. Actual costs are always calculated by MSP
General Tab - used to set the number of change leverls a user can undo and redo - default is 20
Calendar Tab - used to specify the end time - default setting is 5pm
Calculation tab - specifies that MSP calculates actual costs automatically based upon resource rates - per-use resourcee costs and fixed task costs. If checked - a user cannot enter any additional acutal cost until the task is 100% complete. Default
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
35. Show summary tasks
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
General Tab - used to automatically add new resources to the resource pool and assigns them default values whenever a new resource name is entered. default is checked
Calendar Tab - used to specify the start time - the default setting is 8am
View Tab - used to display summary tasks. default is check
36. Use starting year for FY numbering
Calendar Tab - used to label the fiscal year using the calend ear in which the fiscal eyar begins. by default is cleared
View Tab - it is used to specify the number of digits that should appear after the decimal - default is 2
View Tab - used to specify the type of calendar- default is Gregorian 12 month calend start on January 1
Calculation tab - used to specify the number of days of slack MSP uses to determin critical tasks. if the number of slack days for a taks is less than or equal to the number specified here - the task is considered critical. Default is 0 days.
37. Decimal digits
View Tab - it is used to specify the number of digits that should appear after the decimal - default is 2
View Tab - used to display outline symbols next to each task name (A plus sign is displayed next to rolled up summary tasks and a minus sign next to summary tasks showing their subtasks) By default is checked.
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
View Tab - used to specify the type of calendar- default is Gregorian 12 month calend start on January 1
38. User name
Schedule tab - specifies that all new tasks have estimated durations.
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
General Tab - used to display the user name entered when project was installed (the user name can be changed by typing a new name in this box.
Project Information - used to specify the base calendar to be used for the proejct calendar
39. Service options button
General Tab - used to change cutomer feedback and document management options
Security tab - used to set the security level (very high - high - medium or low) default is HIgh - indicating that only signed macros from trusted sources are allowed to run
Schedule tab - specifies that all new tasks have estimated durations.
Security tab - removes the author - manager - company and last saved by fields from the properties dialog box when a project is saved. default is cleared
40. Days per month
Calendar Tab - used to define the number of datys assigned to a task when a duration of one month is entered. Default is 20
Interface tab - used to specify that the feedback triangle should appear in a corner of the duration field or the task name field if task's work - units - or duration is changed. Default is checked
General Tab - used to display the user name entered when project was installed (the user name can be changed by typing a new name in this box.
Calculation tab - specifies whether calculations are done automatically or manually.
41. New tasks
View Tab - used to specify the view that is diplayed at startup - Default is Gantt Chart
Calendar Tab - used to specify the day of the week on twhich the scheduleing week begins
Interface tab - used to specify that the feedback triangle should appear in a corner of a field if additional resources are assigned to a task that already has assigned resources - default - checked.
Schedule tab - used to specify the default start date for new tasks as they are entered in the current project. Project Start Date/no constraint - Start on Current Date/a Start No Earlier Than constraint (using the current date)
42. Schedule from
Project Information - used to specify whether to project is scheduled from a project start date or a project finish date. default is start date
Project Information - used to indicate how readily tasks in the current project are delayed whe resources are leveled across multiple projects. a number between 0 and 1000. the higher the number the higher the priority
General Tab - (this button specifically turns on all planning wizards) you can check individual messages. by default this box is cleared
Calculation tab - used to specify a single critical path throughout the master project (Treating inserted projects as summary tasks in the master project) default is checked.
43. display project guide
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Calculation tab - specifies that MSP calculates actual costs automatically based upon resource rates - per-use resourcee costs and fixed task costs. If checked - a user cannot enter any additional acutal cost until the task is 100% complete. Default
Interface tab - used to diplsy the side pane containing the Project Guide. this is a global setting and applies to all project - default is checked
Security tab - ensures that any project server or workspace sites specified on the collaborate tab of the option dialog box will be added to the list
44. Open last file on startup
General Tab - automatically opens the last proejct file that was used. Default is cleared (if cleared project creates a new project whenever it starts)
View Tab - used to specify whether MSP would accept and automatically update chanes to task dependencies between projects. default is checked. (only available when "Show Link between project dialog box on open" is cleared
Interface tab - used to diplsy the side pane containing the Project Guide. this is a global setting and applies to all project - default is checked
View Tab - used to specify whether the links between projects dialog box should appear when the current project opens and has links to other projects - default is checked
45. Split in progress tasks
Schedule tab - allows rescheduling of remaining duration and work when a task slips or reports progress ahead of shedule. default - checked
Project Information - used to specify the current date. by default this is the computer date and time
Calculation tab - specifies whether calculations are done automatically or manually.
View Tab - used to indent the names of subtasks in the task name - default is checked
46. Default fixed costs accrual
Calculation tab - Used to specify how MSP sets the fixed cost accrual for new tasks. Accrued at the start of a task - prorated throughout - accrued at the end of a task - default is prorated
View Tab - used to specify which currency symbol to be used - default is $
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
View Tab - used to specify which type of currency is being used - default is USD
47. Move end of completed parts after status date back to status date
Calculation tab - this is for tasks that were scheduled to start after the status date but actually started early. the completed portion of the task moves back to the finish at the status date. Defaulted is cleared.
Calendar Tab - used to specify the start time - the default setting is 8am
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
Schedule tab - allows rescheduling of remaining duration and work when a task slips or reports progress ahead of shedule. default - checked
48. Project Guide Content
Calendar Tab - used to specify the month that begins the fiscal year. MSP displays years based on fiscal year. Default is January
Interface tab - used to specify wheter the side pane displys the project guide content that comes with Projec tor customer content that your organization has developed.
General Tab - used to change cutomer feedback and document management options
Calendar Tab - used to define the number of datys assigned to a task when a duration of one month is entered. Default is 20
49. Default task type
General Tab - used to change cutomer feedback and document management options
Used to specify whether the side pane displays the project default main page or a custom page developed by the organization
Schedule tab - for any new task - determines how project recalculates the three related fields - work - duration - and units when one is value is edited
Project Information - used to specify the base calendar to be used for the proejct calendar
50. Currency
Project Information - used to specify the base calendar to be used for the proejct calendar
Interface tab - used to specify that the delete indicator should appear in the indicators field if the text in the task name or resource name field is deleted - default is checked
View Tab - used to specify the position of the currency symbol. default is just before amount
View Tab - used to specify which type of currency is being used - default is USD