Test your basic knowledge |

NATE Air Conditioning Components

Subjects : engineering, nate
Instructions:
  • Answer 50 questions in 15 minutes.
  • If you are not ready to take this test, you can study here.
  • Match each statement with the correct term.
  • Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.

This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. Why is it recommended to add a gravel fill under the pad of a condensing unit...






2. An auxiliary drain pan must...


3. The part of an air conditioning system that changes the refrigerant from a high-pressure liquid to a low-pressure liquid is the...






4. Quick-connect fittings are commonly used on...






5. What must be done to the system when a condensing unit is precharged for 25' of refrigerant line and uses 32' of refrigerant line...






6. A secondary drain line...






7. What type of metering device is used on a 12 SEER split air conditioning system...






8. When soldering a copper connection and solder is drawn into the joint - This is commonly called...






9. What is the 'G' terminal used for on the thermostat...






10. What is the purpose for insulating a suction line...






11. A normally closed float switch that is connected to an auxiliary drain pan should be wired to control...






12. Why is it recommended to add a gravel fill under the pad of a condensing unit...






13. What is the 'W' terminal used for on the thermostat...






14. What is the secondary voltage on a step-down control transformer for a residential furnace...






15. A room thermostat should be mounted...






16. In a sealed system - as the pressure increases...






17. Which part of the system stores refrigerant until it is needed in the evaporator...






18. When installing an evaporator coil - before soldering - the end of the evaporator lines must be opened to the atmosphere because...






19. Before energizing a newly installed system - what test should always be done...






20. Where does the refrigerant change from a low-pressure gas to a high-pressure gas...






21. Which part of the system stores refrigerant until it is needed in the evaporator...






22. What is the 'Y' terminal used for on the thermostat...






23. What is the 'G' terminal used for on the thermostat...






24. Where does the refrigerant change from a high-pressure liquid to a low-pressure liquid...






25. Before energizing a newly installed system - what test should always be done...






26. What is the 'are' terminal used for on the thermostat...






27. Where does the refrigerant change from a high-pressure gas to a high-pressure liquid...






28. What type of fitting uses an O-ring to help seal its joint...






29. An auxiliary drain pan must...


30. Residential split-system outdoor condensing units are commonly wired with a...






31. A secondary drain line...






32. Which part of the system prevents liquid from entering the compressor...






33. The part of an air conditioning system that changes the refrigerant from a low-pressure gas to a high-pressure gas is the...






34. What is the secondary voltage on a step-down control transformer for a residential furnace...






35. What is the 'are' terminal used for on the thermostat...






36. What is the 'W' terminal used for on the thermostat...






37. To ensure proper oil return to the compressor - a coiled refrigeration lineset...






38. What is the 'Y' terminal used for on the thermostat...






39. A normally closed float switch that is connected to an auxiliary drain pan should be wired to control...






40. The part of an air conditioning system that changes the refrigerant from a low-pressure liquid to a low-pressure gas is the...






41. When installing a refrigeration line set through a masonry wall






42. To ensure proper oil return to the compressor - a coiled refrigeration lineset...






43. Quick-connect fittings are commonly used on...






44. What is the purpose for insulating a suction line...






45. Where does the refrigerant change from a low-pressure liquid to a low-pressure gas...






46. To ensure proper oil return to the compressor - when installing a refrigeration line set...






47. To ensure proper oil return to the compressor - when installing a refrigeration line set...






48. When installing an evaporator coil - before soldering - the end of the evaporator lines must be opened to the atmosphere because...






49. Where does the refrigerant change from a low-pressure liquid to a low-pressure gas...






50. A split-system air conditioning unit has...