Test your basic knowledge |
Building Construction Management Vocab
Start Test
Study First
Subjects
:
industries
,
construction
,
business-skills
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. 10' - 15' discontinuous trenches are dug down to bedrock and filled with a bentonite slurry. Concrete is then pumped from the bottom up to create a waterproof wall for excavation pits.
Bentonite Slurry Wall
Insulated metal panels
Laydown Yard/Staging Area
Building Inspector's Process
2. A panelized material applied to the exterior surfaces of wood or light-gauge steel frame members to add rigidity to the frame and to serve as a base for (wall) cladding or roofing.
Permanent Concrete Freeze-Thaw Protection
Sheathing
Pile and Pile Driver
DBB
3. Exterior Sheathing - Water resistant membrane - flashing with weep holes - self-adhering rubberized asphalt membrane - self-furring metal base - scratch coat - brown coat - finish coat.
The role of lime in mortar and mortar types
Stucco - its components and layers
Pile and Pile Driver
tempered glass
4. A ceiling hung from the overlying floor or roof structure.
Laydown Yard/Staging Area
Caisson
Suspended ceiling
Building Code
5. Lumber that ranges from 2 in. to 4 in. thick. The actual dimensions are smaller than the nominal dimensions.
Caisson
Dimensional Lumber - and nominal vs actual dimensions
Type I-V Concrete - and the Roles for Each
Tendons
6. They review the plan sets to make sure they meet code requirements - then they will issue building permits if all codes and regulations are met. During the construction process - an inspector will be called to review the construction of specific part
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
7. Wrought iron is corrosive resistant - time consuming to make - and contains about .02% carbon. VS. Mild Steel contains .1-2.5% carbon and is much stronger and easier to make.
Annealed glass
Wrought iron v. mild steel
Friction vs. End-bearing Pile
Hollow Core Slabs and Planks
8. The combination of high-strength steel strands - sleeves - and end anchorages used for post-tensioning concrete.
Rafter
The role of lime in mortar and mortar types
Tinted glass
Tendons
9. Design Development
Hollow Core Slabs and Planks
DD
Cold Weather Concrete Construction Protection Measures
Admixture
10. Control Joint: A sawed or tooled joint on the top surface of a concrete slab-on-ground; a continuous vertical joint in a concrete masonry wall. Cold Joint: A nonmovement joint resulting when fresh concrete is placed against previously placed concrete
Concrete Control Joints and Cold Joints
PSL
Re-Shoring
tempered glass
11. Using concrete slab blankets or putting hot water in the concrete mix.
Cold Weather Concrete Construction Protection Measures
SD
Light-Gauge Steel Framing
heat-soaked tempered glass
12. Chemical compounds that are used in concrete mixes to increase the workability of the mix without reducing the slump.
Prefabricated v. site-built masonry cladding
EIFS
Plasticizers
Performance vs. Prescriptive Code Provisions
13. Shallow Foundation: Used for all types of buildings and bear directly on the upper soil levels. Deep Foundation: Used where soil on the surface does not have adequate strength or is unstable. Consists of piles or piers.
Shallow vs. Deep Foundations
Rafter
Cold-Formed Light Gauge Steel Members
Slip-critical v. snug-tight connections
14. Shoring placed under concrete to support it while it cures.
Re-Shoring
Dewatering
Sheet Piles and Shoring
heat-soaked tempered glass
15. The combination of high-strength steel strands - sleeves - and end anchorages used for post-tensioning concrete.
Tendons
Wood Light Framing
Veneer
Hollow Core Slabs and Planks
16. Chemical compounds that are used in concrete mixes to increase the workability of the mix without reducing the slump.
Plasticizers
Sheet Piles and Shoring
Light-Gauge Steel Framing
LVL
17. Material added to concrete mix to influence its performance.
Column Footing
Admixture
GFRC
Differential/Uniform Foundation Settlement
18. Using concrete slab blankets or putting hot water in the concrete mix.
CM
Cold Weather Concrete Construction Protection Measures
Slip-critical v. snug-tight connections
AISC standard structural shapes
19. Fabricated at the manufacture's plant. Reinforced in both directions. Uses a steel stud backup wall.
tempered glass
curtain walls
Fire Safety Exiting Requirements
Prefabricated brick panel curtainwall
20. Construction Document
Fire Resistance Rating
Sump and Well Point Dewatering
CD
EIFS
21. A beam that spans between columns on the exterior face of a frame structure.
Spandrel beam
PSL
Annealed glass
DB
22. A rafter is one of a series of sloped structural members that extends from the ridge or the hip down to the downslope perimeter of the eave - designed to support the roof deck and its loads.
Caisson
Sheathing
Rafter
OSB
23. Shoring placed under concrete to support it while it cures.
heat-soaked tempered glass
Re-Shoring
low-e coating
Bentonite Slurry Wall
24. Cee Channel: Studs and joists - symbolized by S - Runner Channel: bridging channels - symbolized by you - Tracks: you shaped - symbolized by T
Cee Channel - Runner Channel - Tracks
Steps in Forming a Reinforced Concrete Wall
Concrete - its components - and their function in the mix
Sheathing
25. Friction Pile: Bears the load by using friction between it and the ground around it by having a tapered form. End-Bearing Piles: Most of the load is transferred to the bottom of the pile.
The Three Phases of Construction Management
Steps in Forming a Reinforced Concrete Wall
Permanent Concrete Freeze-Thaw Protection
Friction vs. End-bearing Pile
26. Unreinforced precast concrete panels that have glass fibers reinforcing the concrete. Consists of the GFRC skin - light-gauge steel backup frame - and anchors connecting the two together.
Precasting vs Site-Casting: Methods & Pros and Cons
Cee Channel - Runner Channel - Tracks
Prefabricated brick panel curtainwall
GFRC
27. An L-shaped steel pin that connects to the GFRC skin with a bonding pad and is welded to the supporting light-gauge steel frame.
Advantages and Disadvantages of High Strength Concrete
Flex anchors
Advantages and Disadvantages of High Strength Concrete
Prefabricated v. site-built masonry cladding
28. A surface coating that reflects most of the long-wave radiation.
Joist
Fire Resistance Rating
low-e coating
Floating and Troweling
29. Load=bearing or non-load bearing wall to which exterior cladding is adhered or anchored.
GFRC
Slump Test
Cold-Formed Light Gauge Steel Members
Backup wall
30. Use air-entrainment in the concrete mix
PSL
LVL
Column Footing
Permanent Concrete Freeze-Thaw Protection
31. Material added to concrete mix to influence its performance.
Flex anchors
Admixture
CM
Building Inspector's Process
32. M = Least amount of lime; O = Most lime; N = Second most lime; S = Second least lime
Concrete - its components - and their function in the mix
Soldier Piles and Lagging
The role of lime in mortar and mortar types
Re-Shoring
33. Prescriptive codes give a clear - defined method for meeting a requirement. Performance codes allow the designer to decide how to meet the end requirement that must be met.
heat-soaked tempered glass
Advantages and Disadvantages of High Strength Concrete
Performance vs. Prescriptive Code Provisions
CD
34. I - C - L - T - Pipes - Tubes - round - Rectangular bars - plates
Mat Foundation
Type I-V Concrete - and the Roles for Each
AISC standard structural shapes
Pre-tentioning and Post-tentioning
35. Truss: a structural member with triangulated - linear elements - typically used for large spans. Bottom Chord:
Laydown Yard/Staging Area
Pre-tentioning and Post-tentioning
Strip Footing
Truss - Bottom Chord and Top Chord
36. Contiguous Bored Concrete Piles: Closely spaced - reinforced concrete piles. Often has shock-crete sprayed on the front to make a wall. Secant Piles: Two sets of interlocking contiguous piles.
Laminated glass
Contiguous Bored Concrete Piles and Secant Piles
Tie Backs
Spandrel beam
37. Fabricated at the manufacture's plant. Reinforced in both directions. Uses a steel stud backup wall.
Laminated glass
Fire Safety Exiting Requirements
Prefabricated brick panel curtainwall
Precasting vs Site-Casting: Methods & Pros and Cons
38. Rebar: An deformed steel bar used as concrete reinforcement. Welded-Wire Reinforcement: A prefabricated rectangular grid of steel wires spot-welded together at intersections - used as reinforcement in concrete slabs.
Dimensional Lumber - and nominal vs actual dimensions
Advantages and Disadvantages of High Strength Concrete
Rebar and Welded Wire Fabric (WWF)
CM
39. Stone panels attached to a backup wall or curtain wall frame.
Fire Resistance Rating
Shallow vs. Deep Foundations
Flat-Sawn vs. Quarter-Sawn Lumber
Stone cladding
40. Slender - closely spaced - parallel beams in a wood light (or light-gauge steel) frame floor.
Joist
Flat-Sawn vs. Quarter-Sawn Lumber
Bentonite Slurry Wall
The role of lime in mortar and mortar types
41. Prescriptive codes give a clear - defined method for meeting a requirement. Performance codes allow the designer to decide how to meet the end requirement that must be met.
Differential/Uniform Foundation Settlement
Cold Weather Concrete Construction Protection Measures
LVL
Performance vs. Prescriptive Code Provisions
42. Sump: Dig sump pits that are sufficiently below the elevation of the excavation - then use sump pumps to drain the water out of the pits and pump it away from the site. Well Point: A number of vertical pipes are sunk around the perimeter of the excav
Caisson
Mat Foundation
Sump and Well Point Dewatering
Precasting vs Site-Casting: Methods & Pros and Cons
43. A type of glass made by adding a metallic pigment during manufacture.
LVL
Tinted glass
Insulated metal panels
Cold-Formed Light Gauge Steel Members
44. Load=bearing or non-load bearing wall to which exterior cladding is adhered or anchored.
Glue-Laminated Lumber
Admixture
tempered glass
Backup wall
45. Lengths of dimension lumber - glued and laminated together to create a structural member of a large cross section.
PSL
Prefabricated brick panel curtainwall
Pressure Treated Lumber
Glue-Laminated Lumber
46. Unreinforced precast concrete panels that have glass fibers reinforcing the concrete. Consists of the GFRC skin - light-gauge steel backup frame - and anchors connecting the two together.
DD
GFRC
SD
Fire Resistance Rating
47. A framing system that mimics wood light frame construction - but the elements are made of cold-formed - galvanized sheet steel.
Light-Gauge Steel Framing
Suspended ceiling
AISC standard structural shapes
Pressure Treated Lumber
48. Pre-Construction - Construction - and Post-Construction Phases
Precasting vs Site-Casting: Methods & Pros and Cons
DB
Wrought iron v. mild steel
The Three Phases of Construction Management
49. Floating: The process of smoothing a freshly placed concrete surface after it has been struck (leveled).
Building Inspector's Process
Floating and Troweling
Flex anchors
Soldier Piles and Lagging
50. Used commonly for load-bearing wood - masonry - or concrete walls.
Shallow vs. Deep Foundations
DBB
Strip Footing
Cold-Formed Light Gauge Steel Members