SUBJECTS
|
BROWSE
|
CAREER CENTER
|
POPULAR
|
JOIN
|
LOGIN
Business Skills
|
Soft Skills
|
Basic Literacy
|
Certifications
About
|
Help
|
Privacy
|
Terms
|
Email
Search
Test your basic knowledge |
Carpentry Basics 3
Start Test
Study First
Subjects
:
industries
,
carpentry
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. A row of shingles or roll roofing running the length of the roof.
Ponderosa pine
Course
Interior
The lumber is cut with the growth rings at an angle greater than 45 degrees
2. A vent pipe that penetrates the roof.
Pressure-treated
Overhang
5 -400
Soil stack
3. At least how many ladder rungs should extend above the eaves to allow a person to step directly out onto the roof?
Flashing
Two
Ridge shingles
Run
4. Green concrete is so named because of its
Silicone Caulk
6-inch offset
Incomplete curing
Curling
5. The vertical distance from the eave line to the ridge.
Architect
Ridge
Rise
Soil stack
6. What enlarged drawings show the builder how various parts are to be connected?
Details
1. Eave 2. Ridge
Remove them after the door is attached to the rough opening
Pitch
7. The degree of roof incline expressed as the ratio of the rise - in inches - to the run - in inches.
Ridge
Slope
Architect
Roll roofing
8. type of construction where each floor of a structure is built as an individual unit is _____ framing.
6
Platform
Eave
1. Eave 2. Ridge
9. At least how many ladder rungs should extend above the eaves to allow a person to step directly out onto the roof?
Sheathing
The lumber is cut with the growth rings at an angle greater than 45 degrees
Two
Span
10. Roofing brackets are constructed to fit the roof's_____.
Framing
A. Sectional views b. Specific detail views
Framing
Pitch
11. A portable circular saw has
No more than 19 percent
Tongue and the blade
Interior
A retractable lower blade guard
12. What can be installed in a home with gable vents to dramatically increase the ventilation of the attic?
Ratio
Drip edge
Ridge vent
Run; rise
13. Balloon frame construction is rarely used today because
Buckling
Foundation
Details
Of lumber and labor costs
14. A _____ plan is a plan of footings and foundation walls.
Overhang
Foundation
Pitch
Cement dermatitus
15. Wooden joists are normally placed _____ OC with the crown _____.
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
16. Elevations required for important features - such as built-in cabinets and shelves - are known as _____ elevations.
Interior
Soil stack
Two
16'; up
17. What type of material can be used in place of a corrosion-resistant metal sleeve and flange to flash a stack (vent)?
Platform
55-pound roll roofing
Architect
Platform
18. What should you use to seal the joints between flashing and other surfaces after holes have been patched?
Foundation
Silicone Caulk
Pitch
Bundle
19. Lines on drawings used to show an outline that is not visible from the view shown are called...
Buckling
Hidden
1. Eave 2. Ridge
1/3
20. A unit of roof measure covering 100 square feet.
Ridge shingles
Tongue and the blade
Square
Sheathing
21. That portion of the roof structure that extends beyond the exterior walls of a building.
Square
Open valley
Course
Overhang
22. The term S-dry on a lumber grade stamp means that the lumber contains ____ moisture
1/4 inch
Platform
No more than 19 percent
Architect
23. The pitch of a roof that has a rise of 8' and a run of 12' is...
4 inches
Span
Framing a house
1/3
24. Any outlet for air that protrudes through the roof deck - such as a pipe or stack. Any device installed on the roof - gable - or soffit for the purpose of ventilating the underside of the roof deck.
Vent
Foundation
Curling
Soil stack
25. When building a stair with a total rise of 7'-7' - the number of risers required and their unit rise is _____.
Warning
: Invalid argument supplied for foreach() in
/var/www/html/basicversity.com/show_quiz.php
on line
183
26. Shingles used to cover the horizontal external angle formed by the intersection of two sloping roof planes.
Interior
Ridge shingles
Drip edge
Sheathing
27. The horizontal - lower edge of a sloped roof.
4 inches
Eave
Tab
6-inch offset
28. To cover the surface of one shingle or roll with another.
Lap
Incomplete curing
11 risers - each 7-1/2' high - AND - 13 risers - each 7' high
Foundation
29. Which type of roof damage is usually caused by improperly applied felt - wrinkled underlayment - or new shingles applied over old - rough shingles?
Unless you are ill or have a family emergency - you should be on the job by the specified time
Vent
Buckling
Unless you are ill or have a family emergency - you should be on the job by the specified time
30. What plan do all of the construction personnel look at?
Buckling
Square
Floor
Finish nail
31. How many pieces of 16' lumber are needed for the soleplates - top plates - and double top plates of a building 40' wide and 30' long?
Unless you are ill or have a family emergency - you should be on the job by the specified time
Floor
Length - width - and height
27
32. A solid line with arrowheads at both ends to indicate the length - width - or height of an object is known as a/an _____ line
Run; rise
Remove them after the door is attached to the rough opening
Flashing
Dimension
33. A portable circular saw has
A retractable lower blade guard
Interior
Pitch
Truss with a steel web
34. A solid line with arrowheads at both ends to indicate the length - width - or height of an object is known as a/an _____ line
Dimension lumber
Pitch
Dimension
Remove them after the door is attached to the rough opening
35. What is the MOST popular layout for installing standard 12-inch tab asphalt shingles?
6-inch offset
Detail
Ponderosa pine
Ventilation
36. A top view of the footings or foundation walls is a/an _____ plan.
Finish nail
The lumber is cut with the growth rings at an angle greater than 45 degrees
Foundation
Incomplete curing
37. The roof incline expressed as the ratio of the rise - in inches - to the span - in inches.
Pitch
Pressure-treated
Orthographic
8'
38. For a given length and size - the type of floor joist with the most strength is a(n)
6 feet
Truss with a steel web
4 inches
No more than 19 percent
39. The roof incline expressed as the ratio of the rise - in inches - to the span - in inches.
Incomplete curing
Interior
Pitch
1. Side to side 2. Top to bottom
40. How should you remove roofing layers when preparing to replace the entire roof?
Nail drip edge along eaves
36' wide - 6'-8' high
1. Side to side 2. Top to bottom
Tongue and the blade
41. What enlarged drawings show the builder how various parts are to be connected?
Details
Silicone Caulk
Open valley
Detail
42. Rolling shingles edges caused by improper number of roofing nails or fasteners placed too high on the shingle.
Truss with a steel web
Roll roofing
One dimension thicker than a common rafter
Curling
43. Which of these tasks falls into the category of rough carpentry?
Butt edge
Framing a house
Span
Ridge
44. How many inches should single-layer underlayment lap over the side lap at the end of all joints?
55-pound roll roofing
Dimension lumber
Architect
4 inches
45. Where should the flashing that joins the roof and vertical walls start and end?
Two
1. Eave 2. Ridge
Ridge vent
18'-0'
46. Green concrete is so named because of its
Soil stack
Sliding T-bevel
Drip edge
Incomplete curing
47. How should you remove roofing layers when preparing to replace the entire roof?
Of lumber and labor costs
1. Side to side 2. Top to bottom
Face of one riser to the face of the next
Silicone Caulk
48. The horizontal distance from eave to eave.
Does not conduct heat as readily
Span
Nail drip edge along eaves
Sheathing
49. When you are installing a prehung door - what should be done with the factory-installed spacer shims between the door and the frame?
27
Remove them after the door is attached to the rough opening
Felt
Curling
50. The degree of roof incline expressed as the ratio of the rise - in inches - to the run - in inches.
6
Sliding T-bevel
Slope
Platform