Test your basic knowledge |

Plumbing Code Basics

Subjects : industries, plumbing
Instructions:
  • Answer 50 questions in 15 minutes.
  • If you are not ready to take this test, you can study here.
  • Match each statement with the correct term.
  • Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.

This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. Is not code for a gas fired appliance with input of 240 - 000 BTU/H.


2. The exit terminals of mechanical draft systems shall be not less than ____ ' above grade where located adjacent to public walkways.






3. Plastic pipe - tubing and fittings used to supply fuel gas shall be used ____ and ____ only.






4. The test medium of a gas system shall be____.






5. Vitrified clay pipe installed underground within buildings shall have____ ' minimum earth cover.


6. Cleanouts shall be installed at each change of direction - except not more than one shall be required in every ____ feet of run.






7. Flexible plastic tubing shall be supported horizontal every____ inches.






8. The distance from the outlet of the water closet to the connection of the wet vent shall be ____ feet vertical and ___ feet horizontal.






9. Torque wrenches are set to release at ____ lbs.






10. Where a vent terminal is within 10 feet horizontally of a ventilation opening it shall be at least ____ feet above the top of the opening.






11. An air conditioning condensate pump which discharges 8 gpm would require a ____ inch horizontal drain.






12. ABS plastic pipes - schedule 40 or 80 May be used in which potable water installation?






13. Where sump pumps discharge at grade on unpaved surfaces - splash blocks at least ____ long shall be used.






14. Sterilzer in hospital surgical room has water waste connection must be disposed through an indirect connection to the drainage system by means of an ____.






15. What is the maximum length for a 3' trap arm?


16. Making capillary joints by soldering of copper and copper alloy tube and fittings shall comply with A). ASTM B828-92 B). NFPA 99C C). ANSI 1018 or D).ASSE 5010?






17. The test pressure on a gas system shall be no less than ____ times the proposed maximum working pressure - but not less than ____ psi.






18. Horizontal branch drain connections shall not be made within ____ pipe diameters from the base of the stack.






19. In a hospital the minimum diameter for recess room floor drain waste trap is ____'


20. Vitrified clay pipe installed underground within buildings shall have ____' minimum earth cover.


21. Grease interceptors shall have a grease retention capacity of not less than ____ pounds for each gpm of flow.






22. If the invert elevation at the first clean out on a 4' sewer is 120.25' - what would be the invert downstream at the second clean out at minimum slope of .125?


23. What is the minimum trap size for a dental lavatory?


24. Where does the building drain end and the building sewer begin?






25. Vacuum breakers for bed pan washers shall be not less than ____ above the floor.






26. What is the minimum drain size required to receive the discharge from a 3/4 inch Temperature and Pressure Valve from an 85 gallon hot water heater?






27. Water may not be discharged onto the drainage system if temperature exceeds _____ degrees F.






28. Light & ventilation falls under basic principle #____.






29. What shall be the depth of lead required for a 3 inch cast-iron water pipe - bell and spigot?






30. Plastic water supply shall use a wall sleeve not less than ____ long.


31. Mechanically formed tee fittings shall have depth stops provided ____ above the dimple that acts as a depth stop.


32. In food handling establishments - all openings through floors shall be sleeved and projecting not less than ___ above the top of finished floor.






33. What is the minimum pressure used to test gas piping with a working pressure less than 125 psi?






34. What is the maximum relief valve setting for CPVC (ASTM F441) hot water distribution?






35. Water closet bowls intended for children's use ages 5 and younger shall be approximately ____ high.











































































































































































































































































































































































36. The device for final conveyance of the gas air to the combustion zone is called a ____.






37. Vent connector located and serving appliances in an attic shall be ________ vent.






38. Metered bends can only be used in gas piping system if the pressure is a maximum of ____ psi.






39. Combination stop and waste valves shall be prohibited where?






40. What is the minimum size floor drain required where sterilizers are located?






41. The vertical distance from the fixture outlet to the trap weir shall not exceed ____'.


42. Vent connector located and serving appliances in an attic shall be ________ vent.






43. What is the minimum size vent piping permitted to be installed underground?






44. What size water softener connection is required for two bathroom groups?


45. 150 - 000 btu/h category 1 fan assisted appliance with vertical run of 20' and a lateral run of 20' minimum vent using diameter of allow using type B wall vent is ____'.


46. Minimum size building drain at 1/4' per foot for 45 drainage fixture units is _____.


47. What size water softener connection is required for two bathroom groups?


48. May be used for distribution of hot potable water






49. What size sewer is needed for 230 Drainage Fixture Units' at 1/4' per foot grade?


50. Cleanouts shall be installed at each change of direction - except not more than one shall be required in every ____ feet of run.