SUBJECTS
|
BROWSE
|
CAREER CENTER
|
POPULAR
|
JOIN
|
LOGIN
Business Skills
|
Soft Skills
|
Basic Literacy
|
Certifications
About
|
Help
|
Privacy
|
Terms
|
Email
Search
Test your basic knowledge |
Plumbing Code Basics
Start Test
Study First
Subjects
:
industries
,
plumbing
Instructions:
Answer 50 questions in 15 minutes.
If you are not ready to take this test, you can
study here
.
Match each statement with the correct term.
Don't refresh. All questions and answers are randomly picked and ordered every time you load a test.
This is a study tool. The 3 wrong answers for each question are randomly chosen from answers to other questions. So, you might find at times the answers obvious, but you will see it re-enforces your understanding as you take the test each time.
1. Torque wrenches are set to release at ____ lbs.
60 lbs
10 1/2 inches to 13 1/2 inches
1/2 hour; 500
125
2. Water piping for the distribution of hot or cold water within buildings shall be of materials rated for not less than_____ psig.
'Type B' gas vents
13
125
100
3. How many gallons of water would be in a pipe 3 inch diameter pipe 314 feet long?
40
1 1/2; 3
115 gallons
3 - 9
4. Testing the plumbing system is basic principle # ____.
5
4'
13
1022
5. Gas piping shall be sloped not less than 1/4 inch in ____ feet
12'
24'
15
119.47'
6. Can be used for appliances with draft hoods.
7. When impractical to pipe the water from a foundation drain to a storm drain - it may discharge to an open area ____' away from property line.
8. Clean-outs in horizontal drainage lines 4' or less shall be spaced at intervals not exceeding ____ feet.
9. Mechanically formed tee fittings shall have depth stops provided ____ above the dimple that acts as a depth stop.
10. Pressure tanks & vessels shall be durable material & constructed to withstand ____ psig.
119.47'
125
41'
pitcher - chain bucket
11. The threaded portion of 1' gas pipe is ____ inches?
12. Pressure type vacuum breakers shall be installed with the critical level at a height of at least ____ ' above the flood level rim for ASSE 1056 devices.
13. Underground gas piping not in conduit shall have a minimum cover of ____ inches.
14. Water distribution piping shall be pressure rated for not less than ____ psig.
80lbs
160
26 degrees
4'
15. What is the maximum relief valve setting for CPVC (ASTM F441) hot water distribution?
150 psi
3/4'
50 psi
Within the building
16. A sewage ejector or sewage pump receiving discharge of water closets or urinals shall have a minimum discharge of ____ gallons per minute.
20
10'
16
1'
17. If supply line of tank is 450 GPM then the I.D. of pipe must be at least ____ inches.
18. What's the maximum dfu's permitted on a 6' sewer at 1/4' per foot?
1 1/2 times working pressure
840
24'
4'
19. What is the maximum length you can run a 1 1/2 inch vent off a 75 gallon per minute sump pump?
20. Cleanouts shall be installed at each change of direction - except not more than one shall be required in every ____ feet of run.
3 inches
15 - 18
18'
40
21. Sterilzer in hospital surgical room has water waste connection must be disposed through an indirect connection to the drainage system by means of an ____.
3
2000
air gap
1 1/2 hours
22. The distance between manholes shall not exceed ___ feet.
23. If gas equipment is not provided with a _____________ - the device must be attached to the equipments' flue collar or as near to the equipment as practical.
240
115 gallons
draft hood
125
24. What is the minimum vent size on a sump serving a macerating toilet system?
25. In a night club which holds 150 people - how many lavatories are needed in the woman's restroom?
24'
6'
24
3
26. No ____ or ____ pumps shall be installed on any potable water supply.
14 AWG
30'
8
pitcher - chain bucket
27. ABS plastic pipes - schedule 40 or 80 May be used in which potable water installation?
3/4'
Water Service Piping
1/2 hour; 500
18
28. Vitrified clay pipe installed underground within buildings shall have ____' minimum earth cover.
29. Water closet bowls intended for children's use ages 5 and younger shall be approximately ____ high.
2 feet
3
150 psi
air gap
Z 124.4
1 1/2; 3
pitcher - chain bucket
32'
80 psi
Within the building
140 degrees
1022
10'
above ground - within building.
150 feet
1 1/4'
18 - 48
2 1/2'
2 feet
Manometer
pitcher - chain bucket
'Type B' gas vents
12'
12'
1 - 762 gallons
12
140 degrees
25'
3 - 525
10 feet
8 inch
11
Grease Interceptors
Grease Interceptors
12'
135'
12
16
80lbs
1/2 hour; 500
1
4 inches
globe valve
7/8'
20
30'
4'
5 inch
5
3/4 inches
30'
10 - 15
1 1/2 inch
8
20
3'
4'
24'
25
12'
18'
12'
15 - 18
18'
60 lbs
18
2-1/4 inch
globe valve
Water Service Piping
2'
40
125
10 feet
adequate capacity
12'
3 fps
Manometer
30'x 2
5'
16
24
30'x 2
4'
1 1/2; 12
#13
3
26 degrees
2'
as close to the appliance a practical
3/4'
4'
C). Oxygen
27 inches
10 foot
10 feet
permanently identified by labels
6'
Black Water
15
3 inches
20
4'
18'
Within the building
3 inches
Z 124.4
1 1/2; 3
1
2'
2'; 1 1/2'
13
3/4 inches
4'
140 degrees
1 - 762 gallons
3'
No.
240
30'
25
Underground
5 feet
3
9 1/2'-- 10 1/2'
5 inch
30'
2 inch
3/4 inch
13
4 inches
1/4'
32 inches
1 1/2 hours
120 degrees to 140 degrees
20
6 inches
30'
2'
10 pipe diameters
3 inch / 3 inch
32'
3 - 525
5'
Underground
3 feet outside a building wall
10 - 15
840
7/8'
3/4'
2'
6'
5'
2 feet per second
90 degrees to 105 degrees
240
5
1 1/2 '
1'
24 gauge.
10 feet
150 psi
7
14 AWG
14 AWG
5'
6'
3'
25'
4 - 513 pounds
24'
1022
80 psi
3 feet outside a building wall
3 inch / 3 inch
3 inch
3 - 9
permanently identified by labels
840
10
Galvanized pipe
4.0
Water Service Piping
2'
24 inches
3/4'
3
3 fps
Outdoor - Underground.
115 gallons
12'
2000
test the appliances
1 - 060
1 - 060
6 inches
60 lbs
1 1/2 hours
C). Oxygen
2000
Air - Nitrogen - carbon dioxide - or an inert gas
2 1/2'
type B or L
160
2 inch
8
26 degrees
1 1/2 times working pressure
Within the building
45 - 40
45 - 40
18
5
adequate capacity
condensate
50 psi
1 1/4'
No.
2 lbs.
5
Carpet
3 inch
8'
vacuum
test the appliances
3/4'
10'
A). ASTM B828-92
150 psi
4 - 513 pounds
12'
10 foot
10 feet
119.47'
12'
4.0
26 degrees
above ground - within building.
75'
3 feet above and 10 feet horizontally
3'
125
24
Neutralizing Device
150 psi
Carpet
1 1/4'
6
1 1/2 times working pressure
condensate
3 feet above and 10 feet horizontally
41'
2'
115 gallons
draft hood
9 1/2'-- 10 1/2'
60'
119.47'
3/4 inches
24'
1 1/2 inch
1 1/2 '
11
7
50 psi
10'
D2729
150 feet
10'
Burner
3
10 1/2 inches to 13 1/2 inches
18 - 48
160
0.2
vacuum
8 inch
6
2 feet per second
8'
100
3 - 9
2 lbs.
12'
Outdoor - Underground.
12'
135'
type B or L
10'
12'
120 degrees to 140 degrees
840
10
4.0
3/4 inches
24'
D2729
5 feet
75'
.2%
10'
10'
4'
A). ASTM B828-92
0.2
10'
840
2'
Black Water
as close to the appliance a practical
4.0
3
5'
Air - Nitrogen - carbon dioxide - or an inert gas
41'
5'
27 inches
100
80lbs
2-1/4 inch
1 1/2; 12
1 1/4'
12'
300'
140 degrees
24 inches
6'
24'
24'
26 degrees
10 feet
189.3 liters
90 degrees to 105 degrees
air gap
10 pipe diameters
1/4'
3/4 inch
12'
Burner
189.3 liters
300'
1'
#13
draft hood
30'
32 inches
15 - 18
40
4'
2'; 1 1/2'
15
18'
.2%
'Type B' gas vents
24 gauge.
10 1/2 inches to 13 1/2 inches
60'
Within the building
9 1/2'-- 10 1/2'
Neutralizing Device
Galvanized pipe
1/2 hour; 500
30. Appliances shall not be installed on ____ unless the appliances are list for such installation.
4 - 513 pounds
2 lbs.
12'
Carpet
31. ABS plastic pipes - schedule 40 or 80 May be used in which potable water installation?
3 feet above and 10 feet horizontally
13
25
Water Service Piping
32. What size gas pipe is required for a 0.5 psi. gas pressure and a pressure drop of 0.5 inch water column 50 feet in length - serving 150 - 000 btu's?
24'
189.3 liters
3/4'
3/4 inch
33. Rectangular shower compartments may have a rough-in dimension width of what?
80lbs
80lbs
test the appliances
27 inches
34. In a confined space - the upper opening supplying the combustion air to fuel burning appliance must be a maximum of ____ inches from ceiling.
35. In food handling establishments - all openings through floors shall be sleeved and projecting not less than ___ above the top of finished floor.
5
3/4 inches
12'
90 degrees to 105 degrees
36. Pressure type vacuum breakers shall be installed with the critical level at a height of at least ____ ' above the flood level rim for ASSE 1056 devices.
37. In a hospital the minimum diameter for recess room floor drain waste trap is ____'
38. Vitrified clay pipe installed underground within buildings shall have____ ' minimum earth cover.
39. Making capillary joints by soldering of copper and copper alloy tube and fittings shall comply with A). ASTM B828-92 B). NFPA 99C C). ANSI 1018 or D).ASSE 5010?
6'
18 - 48
A). ASTM B828-92
5
40. What is the max dfu's permitted to be discharged into a 4' soil stack on a 3 story building?
30'
15 - 18
6
240
41. The bottom of the inlet section for a sand interceptor shall be rated for flow rates up to ____ gpm.
150 psi
7/8'
1 1/2 times working pressure
20
42. A water supply tank with a water supply line of 75gpm shall have an overflow pipe ____' in diameter.
43. Sump pits shall be a minimum of ____ inches in diameter and ____ inches in depth.
15 - 18
Grease Interceptors
4'
125
44. What is the approximate length of threaded portion and approximate number of threads to be cut for a 3' pipe?
30'
1 1/2; 12
2000
8 inch
45. Where does the building drain end and the building sewer begin?
2 feet per second
3 feet outside a building wall
4'
150 psi
46. Gas input ratings of appliances shall be used for elevations up to ____'.
24'
6 inches
1 1/2 hours
2000
47. Potable water supply systems using wells - shall have well casing - curbs and pitless adapters terminating not less than ___ inches above the finished ground surface.
60'
80lbs
8
5'
48. What size storm sewer is needed for a building with a roof 45 feet wide and 85 feet long at 1/8 inch slope - located in boise - Idaho?
49. How many gallons of water would be in a tank which was 5' in diameter - 16' tall - and 3/4 full?
10'
11
140 degrees
1 - 762 gallons
50. Corrosive chemicals that are discharged into the plumbing system must pass through a ____.
air gap
125
Outdoor - Underground.
Neutralizing Device